IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

187

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL2203 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,530 $37,026 Implemented
UL2203 # 05 Y:2022 05 2022 OPTIMIZE PLANT POWER FACTOR $79,271 $45,460 Implemented
UL2203 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,985 $0 Implemented
UK2004 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,067 $2,630 Implemented
UK2004 # 06 Y:2020 06 2020 PREHEAT COMBUSTION AIR WITH WASTE HEAT $71,487 $150,900 Implemented
UK2004 # 09 Y:2020 09 2020 OPTIMIZE PLANT POWER FACTOR $40,258 $23,660 Implemented
UK2004 # 01 Y:2020 01 2020 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $6,031 $21,360 Implemented
UK2004 # 04 Y:2020 04 2020 INCREASE AMOUNT OF CONDENSATE RETURNED $360,000 $250,000 Implemented
UK2004 # 07 Y:2020 07 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $102,672 $4,000 Implemented
UK2004 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,779 $0 Implemented
UK2004 # 05 Y:2020 05 2020 INSULATE BARE EQUIPMENT $52,668 $24,890 Implemented
UK2003 # 07 Y:2020 07 2020 MINIMIZE WATER USAGE $27,840 $15,000 Implemented
UK2003 # 05 Y:2020 05 2020 PREHEAT COMBUSTION AIR WITH WASTE HEAT $15,645 $28,100 Implemented
UK2003 # 04 Y:2020 04 2020 INSULATE BARE EQUIPMENT $4,628 $1,586 Implemented
UK2001 # 07 Y:2020 07 2020 CLEAN CONDENSER TUBES $4,023 $8,700 Implemented
UK2001 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,076 $2,010 Implemented
UK2001 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,887 $9,378 Implemented
UK2001 # 04 Y:2020 04 2020 INSTALL OCCUPANCY SENSORS $571 $875 Implemented
UK1911 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,273 $24,987 Implemented
UK1911 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,560 $3,950 Implemented
UK1911 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $45,696 $27,825 Implemented
UK1911 # 04 Y:2019 04 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,363 $700 Implemented
UK1511 # 07 Y:2015 07 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,050 $0 Implemented
UK1511 # 03 Y:2015 03 2015 OPTIMIZE PLANT POWER FACTOR $9,011 $8,260 Implemented
UK1511 # 04 Y:2015 04 2015 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $596 $0 Implemented