IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,785

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0228 # 04 Y:2025 04 2025 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,292 $1,200 n/a
WM0228 # 01 Y:2025 01 2025 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $13,416 $0 n/a
WM0228 # 02 Y:2025 02 2025 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,628 $3,197 n/a
WM0228 # 03 Y:2025 03 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,531 $4,430 n/a
UF0623 # 06 Y:2024 06 2024 INSTALL TURBULATORS $979 $3,750 n/a
UF0623 # 07 Y:2024 07 2024 IMPROVE COMBUSTION CONTROL CAPABILITY $958 $1,400 n/a
UF0623 # 05 Y:2024 05 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $1,616 $0 n/a
UF0623 # 04 Y:2024 04 2024 INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK $2,627 $2,343 n/a
UF0623 # 02 Y:2024 02 2024 PREHEAT COMBUSTION AIR WITH WASTE HEAT $11,057 $4,000 n/a
UF0623 # 03 Y:2024 03 2024 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $4,089 $5,440 n/a
UF0623 # 01 Y:2024 01 2024 USE DEMAND CONTROLLER OR LOAD SHEDDER $21,088 $3,402 n/a
UF0623 # 08 Y:2024 08 2024 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $56,000 $20,720 n/a
GT0986 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,252 $1,850 n/a
GT0986 # 03 Y:2024 03 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,353 $800 n/a
GT0986 # 04 Y:2024 04 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,990 $2,700 n/a
GT0986 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $18,037 $800 n/a
GT0986 # 05 Y:2024 05 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $463,303 $2,451,174 n/a
AS0590 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $17,979 $93,198 n/a
AS0590 # 05 Y:2024 05 2024 REDUCE HEAT GAIN BY WINDOW TINTING $196 $299 n/a
AS0590 # 03 Y:2024 03 2024 PAY BILLS ON TIME TO AVOID LATE FEES $3,038 $39 n/a
AS0590 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,358 $1,128 n/a
AS0590 # 01 Y:2024 01 2024 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $33,333 $1,245 n/a
UL2413 # 05 Y:2024 05 2024 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $204,012 $328,582 n/a
UL2413 # 01 Y:2024 01 2024 LOWER CEILING TO REDUCE CONDITIONED SPACE $894 $5,000 n/a
UL2413 # 02 Y:2024 02 2024 RECOVER WASTE HEAT FROM EQUIPMENT $45,007 $52,000 n/a