IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

227

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0796 # 01 Y:2024 01 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $733 $546 n/a
OR0796 # 02 Y:2024 02 2024 ADOPT IN-HOUSE MATERIAL GENERATION $86,946 $168,430 n/a
OR0796 # 04 Y:2024 04 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $130,526 $1,312,500 n/a
OR0796 # 03 Y:2024 03 2024 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $584 $2,239 n/a
UU0235 # 02 Y:2024 02 2024 USE STEAM SPARGING OR INJECTIONS IN PLACE OF INDIRECT HEATING $271,861 $3,050,000 Not Implemented
UU0235 # 04 Y:2024 04 2024 USE OPTIMUM THICKNESS INSULATION $6,968 $8,826 Not Implemented
UU0235 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,664 $1,013 Implemented
UU0235 # 03 Y:2024 03 2024 INSULATE BARE EQUIPMENT $12,478 $23,282 Not Implemented
UU0236 # 03 Y:2024 03 2024 INSULATE BARE EQUIPMENT $16,698 $11,570 Implemented
UU0236 # 04 Y:2024 04 2024 INSULATE BARE EQUIPMENT $5,640 $3,090 Implemented
UU0236 # 01 Y:2024 01 2024 REPLACE BOILER $208,300 $1,070,720 Implemented
UU0236 # 02 Y:2024 02 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $72,320 $46,000 Implemented
UU0224 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,460 $1,382 Implemented
UU0224 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,006 $51 Implemented
UU0224 # 04 Y:2023 04 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,361 $1,485 Implemented
UU0224 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,006 $10,650 Implemented
UU0224 # 05 Y:2023 05 2023 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $2,224 $4,500 Not Implemented
UU0224 # 02 Y:2023 02 2023 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $10,206 $7,560 Implemented
BS0153 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $733 $490 Not Implemented
BS0153 # 02 Y:2021 02 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $36,134 $5,961 Not Implemented
BS0153 # 04 Y:2021 04 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $98,310 $307,800 Not Implemented
BS0153 # 01 Y:2021 01 2021 INSTALL OCCUPANCY SENSORS $30,759 $3,726 Not Implemented
BS0146 # 03 Y:2021 03 2021 INSTALL OCCUPANCY SENSORS $622 $1,174 Not Implemented
BS0146 # 04 Y:2021 04 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $992 $159 Not Implemented
BS0146 # 06 Y:2021 06 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $686 $972 Not Implemented