Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
366
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0061 # 03 Y:1995 | 03 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,037 | $276 | Not Implemented |
NC0061 # 04 Y:1995 | 04 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $667 | $532 | Not Implemented |
NC0061 # 05 Y:1995 | 05 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $217 | $980 | Implemented |
NC0061 # 06 Y:1995 | 06 | 1995 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $64,115 | $12,675 | Not Implemented |
NC0061 # 07 Y:1995 | 07 | 1995 | REDESIGN PROCESS | $12,097 | $15,250 | Not Implemented |
NC0052 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,358 | $2,000 | Implemented |
NC0052 # 02 Y:1995 | 02 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $403 | $100 | Implemented |
NC0052 # 03 Y:1995 | 03 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,087 | $120 | Implemented |
NC0052 # 04 Y:1995 | 04 | 1995 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $6,703 | $15,000 | Not Implemented |
NC0052 # 05 Y:1995 | 05 | 1995 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $784 | $900 | Not Implemented |
NC0052 # 06 Y:1995 | 06 | 1995 | KEEP BOILER TUBES CLEAN | $8,880 | $0 | Implemented |
NC0052 # 07 Y:1995 | 07 | 1995 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $1,850 | $0 | Not Implemented |
NC0052 # 08 Y:1995 | 08 | 1995 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $71,177 | $500 | Not Implemented |
NC0052 # 09 Y:1995 | 09 | 1995 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $11,944 | $18,477 | Not Implemented |
NC0023 # 01 Y:1994 | 01 | 1994 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,130 | $0 | Not Implemented |
NC0023 # 02 Y:1994 | 02 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $385 | $770 | Implemented |
NC0023 # 03 Y:1994 | 03 | 1994 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $3,610 | $7,500 | Not Implemented |
NC0023 # 04 Y:1994 | 04 | 1994 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $122,824 | $35,000 | Not Implemented |
NC0023 # 05 Y:1994 | 05 | 1994 | RECOVER WASTE HEAT FROM EQUIPMENT | $72,336 | $30,000 | Not Implemented |
NC0023 # 06 Y:1994 | 06 | 1994 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $148,485 | $65,000 | Not Implemented |
NC0023 # 07 Y:1994 | 07 | 1994 | INSTALL / REPAIR INSULATION ON STEAM LINES | $297 | $97 | Not Implemented |
TN0394 # 09 Y:1990 | 09 | 1990 | INSULATE BARE EQUIPMENT | $167 | $459 | Implemented |
TN0394 # 08 Y:1990 | 08 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $451 | $270 | Implemented |
TN0394 # 07 Y:1990 | 07 | 1990 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $668 | $1,963 | Implemented |
TN0394 # 06 Y:1990 | 06 | 1990 | INSTALL TIMERS AND/OR THERMOSTATS | $1,838 | $840 | Implemented |