IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

360

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0052 # 02 Y:1995 02 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $403 $100 Implemented
NC0052 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,087 $120 Implemented
NC0052 # 04 Y:1995 04 1995 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $6,703 $15,000 Not Implemented
NC0052 # 05 Y:1995 05 1995 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $784 $900 Not Implemented
NC0052 # 06 Y:1995 06 1995 KEEP BOILER TUBES CLEAN $8,880 $0 Implemented
NC0052 # 07 Y:1995 07 1995 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,850 $0 Not Implemented
NC0052 # 08 Y:1995 08 1995 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $71,177 $500 Not Implemented
NC0052 # 09 Y:1995 09 1995 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $11,944 $18,477 Not Implemented
NC0023 # 01 Y:1994 01 1994 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,130 $0 Not Implemented
NC0023 # 02 Y:1994 02 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $385 $770 Implemented
NC0023 # 03 Y:1994 03 1994 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,610 $7,500 Not Implemented
NC0023 # 04 Y:1994 04 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $122,824 $35,000 Not Implemented
NC0023 # 05 Y:1994 05 1994 RECOVER WASTE HEAT FROM EQUIPMENT $72,336 $30,000 Not Implemented
NC0023 # 06 Y:1994 06 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $148,485 $65,000 Not Implemented
NC0023 # 07 Y:1994 07 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $297 $97 Not Implemented
TN0394 # 01 Y:1990 01 1990 HEAT WATER WITH EXHAUST HEAT $54,274 $73,320 Not Implemented
TN0394 # 02 Y:1990 02 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $5,454 $2,060 Implemented
TN0394 # 03 Y:1990 03 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,219 $1,000 Not Implemented
TN0394 # 04 Y:1990 04 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,298 $0 Implemented
TN0394 # 05 Y:1990 05 1990 INSULATE BARE EQUIPMENT $513 $565 Not Implemented
TN0394 # 06 Y:1990 06 1990 INSTALL TIMERS AND/OR THERMOSTATS $1,838 $840 Implemented
TN0394 # 07 Y:1990 07 1990 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $668 $1,963 Implemented
TN0394 # 08 Y:1990 08 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $451 $270 Implemented
TN0394 # 09 Y:1990 09 1990 INSULATE BARE EQUIPMENT $167 $459 Implemented
AT0111 # 01 Y:1988 01 1988 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $39,530 $60,000 Not Implemented