IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

284

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OD0019 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $301 $1,102 Implemented
OD0019 # 03 Y:1995 03 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $189 $416 Implemented
OD0019 # 04 Y:1995 04 1995 AVOID FROST FORMATION ON EVAPORATORS $11,972 $16,500 Not Implemented
OD0019 # 05 Y:1995 05 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,306 $8,136 Not Implemented
OD0009 # 01 Y:1994 01 1994 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $9,540 $7,075 Not Implemented
OD0009 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,145 $800 Implemented
OD0009 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,516 $2,392 Not Implemented
OD0009 # 04 Y:1994 04 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,987 $5,625 Not Implemented
OD0009 # 05 Y:1994 05 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $648 $498 Implemented
OD0009 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,854 $13,330 Implemented
OD0009 # 07 Y:1994 07 1994 PAY UTILITY BILLS ON TIME $481 $0 Implemented
OD0006 # 01 Y:1994 01 1994 INSULATE BARE EQUIPMENT $4,164 $1,700 Not Implemented
OD0006 # 02 Y:1994 02 1994 MINIMIZE WATER USAGE $9,575 $1,920 Not Implemented
OD0006 # 03 Y:1994 03 1994 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $190 $170 Implemented
OD0006 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $420 $380 Implemented
OD0006 # 05 Y:1994 05 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $887 $1,612 Implemented
OD0006 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,771 $6,574 Implemented
TN0337 # 01 Y:1988 01 1988 INSTALL / REPAIR INSULATION ON STEAM LINES $14,407 $2,574 Not Implemented
TN0337 # 02 Y:1988 02 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,720 $0 Implemented
TN0337 # 03 Y:1988 03 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,896 $1,110 Implemented
TN0337 # 04 Y:1988 04 1988 REPAIR AND ELIMINATE STEAM LEAKS $771 $225 Implemented
TN0337 # 05 Y:1988 05 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,271 $0 Not Implemented
TN0337 # 06 Y:1988 06 1988 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,144 $0 Not Implemented
TN0337 # 07 Y:1988 07 1988 IMPROVE LUBRICATION PRACTICES $411 $600 Not Implemented
TN0337 # 08 Y:1988 08 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $411 $385 Not Implemented