IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,196

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0277 # 08 Y:2015 08 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,698 $639 Implemented
MI0277 # 09 Y:2015 09 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,440 $40 Implemented
MI0277 # 10 Y:2015 10 2015 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,737 $3,280 Implemented
MI0277 # 11 Y:2015 11 2015 USE OPTIMUM THICKNESS INSULATION $1,507 $1,610 Implemented
MI0277 # 12 Y:2015 12 2015 INSTALL OCCUPANCY SENSORS $1,295 $290 Implemented
MI0277 # 13 Y:2015 13 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $574 $1,400 Implemented
MI0277 # 14 Y:2015 14 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $459 $90 Implemented
MI0274 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $34,151 $1,660 Implemented
MI0274 # 02 Y:2015 02 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $14,336 $140 Implemented
MI0274 # 03 Y:2015 03 2015 BURN A LESS EXPENSIVE GRADE OF FUEL $10,584 $14,880 Not Implemented
MI0274 # 04 Y:2015 04 2015 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $10,327 $4,691 Implemented
MI0274 # 05 Y:2015 05 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,833 $11,640 Implemented
MI0274 # 06 Y:2015 06 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,565 $40 Implemented
MI0274 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,430 $1,710 Implemented
MI0274 # 08 Y:2015 08 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,100 $639 Implemented
MI0274 # 09 Y:2015 09 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,582 $6,871 Implemented
MI0274 # 10 Y:2015 10 2015 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,145 $780 Implemented
MI0274 # 11 Y:2015 11 2015 USE OPTIMUM THICKNESS INSULATION $626 $360 Implemented
MI0274 # 12 Y:2015 12 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $457 $160 Implemented
MI0274 # 13 Y:2015 13 2015 INSULATE BARE EQUIPMENT $320 $310 Not Implemented
MI0274 # 14 Y:2015 14 2015 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $253 $320 Implemented
MI0267 # 01 Y:2014 01 2014 UTILIZE A LESS EXPENSIVE COOLING METHOD $18,615 $80,000 Implemented
MI0267 # 02 Y:2014 02 2014 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $14,962 $2,560 Not Implemented
MI0267 # 03 Y:2014 03 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,086 $80 Not Implemented
MI0267 # 04 Y:2014 04 2014 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $5,029 $3,340 Implemented