IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

479

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0481 # 02 Y:1993 02 1993 INSTALL SPECTRAL REFLECTORS / DELAMP $12,347 $13,957 Not Implemented
TN0481 # 03 Y:1993 03 1993 IMPROVE COMBUSTION CONTROL CAPABILITY $459 $625 Implemented
TN0481 # 04 Y:1993 04 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,512 $510 Implemented
TN0481 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,178 $741 Implemented
MA0265 # 01 Y:1993 01 1993 COVER OPEN TANKS $7,538 $5,000 Implemented
MA0265 # 02 Y:1993 02 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,788 $12,305 Not Implemented
MA0265 # 03 Y:1993 03 1993 RECOVER WASTE HEAT FROM EQUIPMENT $3,525 $12,420 Implemented
MA0265 # 04 Y:1993 04 1993 INSTALL OCCUPANCY SENSORS $114 $85 Not Implemented
MA0265 # 05 Y:1993 05 1993 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $49,714 $17,787 Not Implemented
OR0169 # 01 Y:1993 01 1993 MINIMIZE WATER USAGE $1,778 $286 Not Implemented
OR0169 # 02 Y:1993 02 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,622 $1,500 Not Implemented
OR0169 # 03 Y:1993 03 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,454 $4,460 Not Implemented
OR0169 # 04 Y:1993 04 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $157 $0 Not Implemented
OR0169 # 05 Y:1993 05 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $627 $1,466 Not Implemented
OR0169 # 06 Y:1993 06 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $859 $3,050 Not Implemented
OR0169 # 07 Y:1993 07 1993 REMOVE UNNEEDED SERVICE LINES TO ELIMINATE POTENTIAL LEAKS $977 $0 Not Implemented
OR0169 # 08 Y:1993 08 1993 UTILIZE A LESS EXPENSIVE COOLING METHOD $8,598 $35,200 Not Implemented
IA0050 # 01 Y:1993 01 1993 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $3,114 $4,500 Not Implemented
IA0050 # 02 Y:1993 02 1993 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $1,319 $2,500 Implemented
IA0050 # 03 Y:1993 03 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $655 $60 Not Implemented
IA0050 # 04 Y:1993 04 1993 INSULATE BARE EQUIPMENT $1,872 $2,000 Not Implemented
IA0050 # 05 Y:1993 05 1993 INSULATE BARE EQUIPMENT $446 $100 Not Implemented
IA0050 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $686 $234 Implemented
IA0050 # 07 Y:1993 07 1993 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $93 $0 Implemented
KU0393 # 01 Y:1993 01 1993 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $14,813 $23,600 Not Implemented