IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

511

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0433 # 08 Y:2017 08 2017 REPLACE BOILER $397,300 $900,000 Not Implemented
LE0433 # 09 Y:2017 09 2017 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $9,040 $22,500 Not Implemented
LE0433 # 10 Y:2017 10 2017 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $18,899 $58,000 Not Implemented
LE0433 # 11 Y:2017 11 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $16,503 $54,000 Not Implemented
LE0433 # 12 Y:2017 12 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,262 $8,160 Not Implemented
LE0433 # 13 Y:2017 13 2017 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $53,347 $200,000 Not Implemented
LE0433 # 14 Y:2017 14 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $337 $1,488 Not Implemented
LE0433 # 15 Y:2017 15 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,312 $10,220 Not Implemented
UU0115 # 01 Y:2017 01 2017 DISCONNECT BALLASTS $296 $0 Implemented
UU0115 # 02 Y:2017 02 2017 INSTALL OCCUPANCY SENSORS $444 $438 Implemented
UU0115 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,840 $0 Implemented
UU0115 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $931 $2,500 Not Implemented
UU0115 # 05 Y:2017 05 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,766 $0 Implemented
WM0102 # 01 Y:2017 01 2017 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $149,714 $205,925 Not Implemented
WM0102 # 02 Y:2017 02 2017 USE POWER DURING OFF-PEAK PERIODS $23,950 $64,500 Not Implemented
WM0102 # 03 Y:2017 03 2017 REPAIR AND ELIMINATE STEAM LEAKS $9,764 $1,490 Not Implemented
WM0102 # 04 Y:2017 04 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,200 $1,100 Not Implemented
WM0102 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,059 $5,282 Not Implemented
WM0102 # 06 Y:2017 06 2017 INSULATE BARE EQUIPMENT $2,034 $4,700 Not Implemented
WM0102 # 07 Y:2017 07 2017 INSULATE BARE EQUIPMENT $1,239 $863 Not Implemented
UD0965 # 01 Y:2017 01 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,857 $0 Not Implemented
UD0965 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $303 $0 Not Implemented
UD0965 # 03 Y:2017 03 2017 USE AUTOMATIC CLEANING EQUIPMENT $15,770 $0 Implemented
UD0965 # 04 Y:2017 04 2017 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $6,437 $700 Implemented
UD0965 # 05 Y:2017 05 2017 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $26,366 $2,000 Implemented