IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

630

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0532 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,393 $5,160 Not Implemented
LE0532 # 05 Y:2022 05 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,896 $15,000 Not Implemented
LE0520 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,006 $35 Not Implemented
LE0520 # 04 Y:2022 04 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,958 $50,000 Not Implemented
LE0520 # 02 Y:2022 02 2022 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $9,676 $23,000 Not Implemented
LE0520 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,247 $4,450 Implemented
LE0513 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,214 $1,500 Not Implemented
LE0513 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $362 $1,250 Not Implemented
LE0513 # 03 Y:2021 03 2021 USE OPTIMUM TEMPERATURE $1,846 $2,500 Not Implemented
LE0513 # 05 Y:2021 05 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,170 $9,500 Not Implemented
LE0513 # 02 Y:2021 02 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,153 $1,500 Not Implemented
LE0513 # 06 Y:2021 06 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,313 $22,000 Not Implemented
LE0506 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,519 $5,000 Not Implemented
LE0506 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,556 $11,500 Not Implemented
LE0506 # 03 Y:2021 03 2021 PREHEAT COMBUSTION AIR WITH WASTE HEAT $36,412 $80,000 Not Implemented
LE0506 # 04 Y:2021 04 2021 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $108,239 $800,000 Not Implemented
DL0188 # 13 Y:2021 13 2021 RECOVER WASTE HEAT FROM EQUIPMENT $6,000 $5,500 Not Implemented
DL0188 # 12 Y:2021 12 2021 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $25,290 $57,350 Implemented
DL0188 # 09 Y:2021 09 2021 RECOVER WASTE HEAT FROM EQUIPMENT $7,620 $7,000 Not Implemented
DL0188 # 06 Y:2021 06 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,987 $20,000 Not Implemented
DL0188 # 08 Y:2021 08 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,340 $48,750 Not Implemented
DL0188 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN WATER LINES AND VALVES $900 $0 Implemented
DL0188 # 02 Y:2021 02 2021 METER WASTE WATER $172,100 $3,000 Not Implemented
DL0188 # 03 Y:2021 03 2021 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $23,050 $9,490 Implemented
DL0188 # 04 Y:2021 04 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $860 $81,000 Implemented