IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

529

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0085 # 07 Y:1983 07 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $51,359 $2,500 Implemented
KU0085 # 08 Y:1983 08 1983 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $6,788 $10,000 Not Implemented
KU0085 # 09 Y:1983 09 1983 USE MINIMUM STEAM OPERATING PRESSURE $5,708 $0 Not Implemented
KU0061 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,078 $3,361 Not Implemented
KU0061 # 02 Y:1982 02 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,765 $1,000 Not Implemented
KU0061 # 03 Y:1982 03 1982 INSTALL TIMERS AND/OR THERMOSTATS $1,549 $1,200 Not Implemented
KU0061 # 04 Y:1982 04 1982 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $4,660 $3,800 Not Implemented
KU0061 # 05 Y:1982 05 1982 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,767 $9,000 Not Implemented
KU0065 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,491 $47,000 Not Implemented
KU0065 # 02 Y:1982 02 1982 INSTALL / REPAIR INSULATION ON STEAM LINES $12,228 $1,619 Not Implemented
KU0065 # 03 Y:1982 03 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,815 $0 Implemented
KU0065 # 04 Y:1982 04 1982 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $441 $0 Not Implemented
KU0065 # 05 Y:1982 05 1982 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $459 $1,000 Not Implemented
KU0065 # 06 Y:1982 06 1982 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $290 $0 Not Implemented
KU0065 # 07 Y:1982 07 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $214 $59 Not Implemented
KU0065 # 08 Y:1982 08 1982 INSTALL AUTOMATIC STACK DAMPER $326 $528 Not Implemented
KU0056 # 01 Y:1982 01 1982 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,692 $2,784 Implemented
KU0056 # 02 Y:1982 02 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $17,863 $2,000 Implemented
KU0056 # 03 Y:1982 03 1982 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $16,065 $20,000 Implemented
KU0056 # 04 Y:1982 04 1982 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $14,900 $450 Not Implemented
KU0056 # 05 Y:1982 05 1982 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $10,800 $20,000 Implemented
KU0056 # 06 Y:1982 06 1982 INSTALL / REPAIR INSULATION ON STEAM LINES $5,190 $1,724 Implemented
KU0056 # 07 Y:1982 07 1982 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,225 $1,000 Implemented
KU0056 # 08 Y:1982 08 1982 RECOVER WASTE HEAT FROM EQUIPMENT $3,030 $2,940 Implemented
KU0058 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,433 $1,567 Not Implemented