IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

516

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0464 # 01 Y:2019 01 2019 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $59,350 $126,000 Implemented
AS0464 # 02 Y:2019 02 2019 USE SOLAR HEAT FOR HEAT $48,323 $319,500 Not Implemented
AS0464 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $20,226 $2,867 Not Implemented
AS0464 # 04 Y:2019 04 2019 INCREASE EFFICIENCY OF TRUCKS $15,760 $26,200 Not Implemented
AS0464 # 05 Y:2019 05 2019 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $7,910 $3,232 Not Implemented
AS0464 # 06 Y:2019 06 2019 REPAIR AND ELIMINATE STEAM LEAKS $3,137 $348 Implemented
AS0463 # 01 Y:2019 01 2019 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $56,524 $90,000 Implemented
AS0463 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $31,405 $2,867 Not Implemented
AS0463 # 03 Y:2019 03 2019 INCREASE EFFICIENCY OF TRUCKS $11,257 $18,720 Not Implemented
AS0463 # 04 Y:2019 04 2019 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $8,082 $3,232 Not Implemented
AS0463 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,693 $0 Implemented
AS0463 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,398 $6,295 Implemented
BS0118 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,275 $20 Not Implemented
BS0118 # 02 Y:2019 02 2019 INSULATE BARE EQUIPMENT $616 $960 Not Implemented
BS0118 # 03 Y:2019 03 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $257 $30 Not Implemented
BS0118 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $1,313 $760 Not Implemented
BS0118 # 05 Y:2019 05 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $821 $275 Not Implemented
BS0118 # 06 Y:2019 06 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $545 $210 Not Implemented
BS0118 # 07 Y:2019 07 2019 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $10,186 $790 Not Implemented
SF0532 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $879 $0 Implemented
SF0532 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,844 $20,718 Implemented
SF0532 # 03 Y:2019 03 2019 INSULATE BARE EQUIPMENT $2,762 $4,681 Not Implemented
SF0532 # 04 Y:2019 04 2019 INSULATE BARE EQUIPMENT $1,777 $4,972 Not Implemented
SF0532 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $950 $2,757 Implemented
SF0532 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,025 $8,491 Implemented