IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,647

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0510 # 06 Y:2017 06 2017 USE SOLAR HEAT TO MAKE ELECTRICTY $56,686 $504,000 Not Implemented
SF0509 # 01 Y:2017 01 2017 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $2,452 $0 Not Implemented
SF0509 # 02 Y:2017 02 2017 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $6,821 $0 Not Implemented
SF0509 # 03 Y:2017 03 2017 INSTALL TIMERS AND/OR THERMOSTATS $17,732 $2,539 Implemented
SF0509 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $596 $140 Not Implemented
SF0509 # 05 Y:2017 05 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $11,813 $10,550 Implemented
SF0509 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,416 $53,848 Implemented
SF0509 # 07 Y:2017 07 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,893 $42,428 Implemented
SF0509 # 08 Y:2017 08 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,625 $31,216 Not Implemented
SF0509 # 09 Y:2017 09 2017 ADOPT IN-HOUSE MATERIAL GENERATION $38,233 $90,166 Not Implemented
SF0508 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,154 $0 Implemented
SF0508 # 02 Y:2017 02 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $20,198 $2,023 Implemented
SF0508 # 03 Y:2017 03 2017 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $640 $553 Not Implemented
SF0508 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,172 $20,431 Not Implemented
SF0508 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,954 $26,825 Implemented
SF0508 # 06 Y:2017 06 2017 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $1,181 $6,155 Not Implemented
SF0507 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,318 $0 Implemented
SF0507 # 02 Y:2017 02 2017 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $7,895 $560 Implemented
SF0507 # 03 Y:2017 03 2017 REPAIR AND ELIMINATE STEAM LEAKS $1,567 $156 Implemented
SF0507 # 04 Y:2017 04 2017 INSULATE BARE EQUIPMENT $8,398 $3,902 Implemented
SF0507 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $116,456 $172,681 Implemented
SF0507 # 06 Y:2017 06 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,369 $12,526 Implemented
SF0507 # 07 Y:2017 07 2017 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $54,833 $312,470 Implemented
SF0506 # 01 Y:2017 01 2017 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,307 $0 Implemented
SF0506 # 02 Y:2017 02 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,881 $728 Implemented