Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20,689
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0087 # 01 Y:2023 | 01 | 2023 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $491,419 | $1,990,800 | n/a |
NL0087 # 02 Y:2023 | 02 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $254,315 | $454,461 | n/a |
NL0087 # 03 Y:2023 | 03 | 2023 | REPAIR OR REPLACE STEAM TRAPS | $17,666 | $50 | n/a |
NL0087 # 04 Y:2023 | 04 | 2023 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $12,625 | $8,000 | n/a |
NL0087 # 05 Y:2023 | 05 | 2023 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $11,616 | $7,640 | n/a |
NL0087 # 06 Y:2023 | 06 | 2023 | RECOVER AND REUSE WASTE MATERIAL | $10,817 | $3,660 | n/a |
NL0087 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,789 | $100 | n/a |
NL0087 # 08 Y:2023 | 08 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,019 | $768 | n/a |
CI0017 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $271,104 | $1,391,144 | n/a |
CI0017 # 02 Y:2023 | 02 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $63,711 | $90,000 | n/a |
CI0017 # 03 Y:2023 | 03 | 2023 | REPLACE BOILER | $25,947 | $36,000 | n/a |
CI0017 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,971 | $39,000 | n/a |
CI0017 # 05 Y:2023 | 05 | 2023 | USE POWER DURING OFF-PEAK PERIODS | $12,483 | $22,000 | n/a |
CI0017 # 06 Y:2023 | 06 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,433 | $1,500 | n/a |
CI0017 # 07 Y:2023 | 07 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,491 | $0 | n/a |
CI0017 # 08 Y:2023 | 08 | 2023 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $1,591 | $5,000 | n/a |
OR0773 # 01 Y:2023 | 01 | 2023 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $5,439 | $1,278 | Implemented |
OR0773 # 02 Y:2023 | 02 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,051 | $797 | Implemented |
OR0773 # 03 Y:2023 | 03 | 2023 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $8,507 | $13,124 | Not Implemented |
OR0773 # 04 Y:2023 | 04 | 2023 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $1,262 | $12,121 | Not Implemented |
NL0086 # 01 Y:2023 | 01 | 2023 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $48,136 | $100,000 | n/a |
NL0086 # 02 Y:2023 | 02 | 2023 | INSULATE BARE EQUIPMENT | $6,202 | $6,211 | n/a |
NL0086 # 03 Y:2023 | 03 | 2023 | METER WASTE WATER | $4,239 | $1,348 | n/a |
NL0086 # 04 Y:2023 | 04 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $573 | $510 | n/a |
NL0086 # 05 Y:2023 | 05 | 2023 | KEEP EQUIPMENT CLEAN | $350 | $450 | n/a |