IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,647

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0506 # 03 Y:2017 03 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $4,033 $4,499 Implemented
SF0506 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,187 $14,341 Not Implemented
SF0506 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,722 $46,373 Implemented
SF0506 # 06 Y:2017 06 2017 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $2,157 $5,830 Not Implemented
SF0506 # 07 Y:2017 07 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,791 $21,455 Not Implemented
SF0506 # 08 Y:2017 08 2017 ADOPT IN-HOUSE MATERIAL GENERATION $74,931 $224,896 Not Implemented
SF0502 # 01 Y:2017 01 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,509 $80 Implemented
SF0502 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $379,684 $84,889 Implemented
SF0502 # 03 Y:2017 03 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $10,648 $2,311 Implemented
SF0502 # 04 Y:2017 04 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $25,335 $7,208 Not Implemented
SF0502 # 05 Y:2017 05 2017 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $21,631 $14,971 Implemented
SF0502 # 06 Y:2017 06 2017 REDESIGN PROCESS $46,628 $18,660 Implemented
SF0502 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $76,288 $138,203 Implemented
SF0502 # 08 Y:2017 08 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $11,335 $14,290 Implemented
SF0502 # 09 Y:2017 09 2017 INSULATE FEEDWATER TANK $1,760 $3,244 Not Implemented
SF0502 # 10 Y:2017 10 2017 INSULATE BARE EQUIPMENT $13,080 $26,316 Not Implemented
SF0502 # 11 Y:2017 11 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $44,617 $187,946 Not Implemented
SF0501 # 01 Y:2017 01 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,520 $0 Implemented
SF0501 # 02 Y:2017 02 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,047 $0 Not Implemented
SF0501 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $777 $84 Not Implemented
SF0501 # 04 Y:2017 04 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,074 $1,769 Implemented
SF0501 # 05 Y:2017 05 2017 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $2,356 $1,821 Not Implemented
SF0501 # 06 Y:2017 06 2017 USE SOLAR HEAT TO MAKE ELECTRICTY $147,360 $665,154 Not Implemented
SF0500 # 01 Y:2017 01 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $161 $294 Implemented
SF0500 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,814 $7,558 Implemented