IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,034

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0181 # 04 Y:1993 04 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,107 $8,107 Implemented
OR0181 # 05 Y:1993 05 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,917 $13,850 Not Implemented
OR0181 # 06 Y:1993 06 1993 REDUCE FLUID FLOW RATES $30,043 $6,000 Implemented
OR0181 # 07 Y:1993 07 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,651 $989 Implemented
OR0169 # 01 Y:1993 01 1993 MINIMIZE WATER USAGE $1,778 $286 Not Implemented
OR0169 # 02 Y:1993 02 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,622 $1,500 Not Implemented
OR0169 # 03 Y:1993 03 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,454 $4,460 Not Implemented
OR0169 # 04 Y:1993 04 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $157 $0 Not Implemented
OR0169 # 05 Y:1993 05 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $627 $1,466 Not Implemented
OR0169 # 06 Y:1993 06 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $859 $3,050 Not Implemented
OR0169 # 07 Y:1993 07 1993 REMOVE UNNEEDED SERVICE LINES TO ELIMINATE POTENTIAL LEAKS $977 $0 Not Implemented
OR0169 # 08 Y:1993 08 1993 UTILIZE A LESS EXPENSIVE COOLING METHOD $8,598 $35,200 Not Implemented
OR0168 # 01 Y:1993 01 1993 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $2,253 $0 Implemented
OR0168 # 02 Y:1993 02 1993 OPERATE BOILERS ON HIGH FIRE SETTING $134 $0 Implemented
OR0168 # 03 Y:1993 03 1993 HEAT WATER WITH EXHAUST HEAT $3,366 $500 Implemented
OR0168 # 04 Y:1993 04 1993 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,200 $1,152 Implemented
OR0168 # 05 Y:1993 05 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $378 $1,008 Implemented
OR0168 # 06 Y:1993 06 1993 KEEP BOILER TUBES CLEAN $351 $1,000 Implemented
OR0165 # 01 Y:1992 01 1992 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $4,045 $500 Implemented
OR0165 # 02 Y:1992 02 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,788 $0 Implemented
OR0165 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,356 $0 Not Implemented
OR0165 # 04 Y:1992 04 1992 OPTIMIZE PLANT POWER FACTOR $1,074 $2,250 Implemented
OR0165 # 05 Y:1992 05 1992 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $830 $0 Implemented
OR0165 # 06 Y:1992 06 1992 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $320 $824 Implemented
OR0164 # 01 Y:1992 01 1992 OPERATE BOILERS ON HIGH FIRE SETTING $3,115 $0 Not Implemented