Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,018
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0168 # 05 Y:1993 | 05 | 1993 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $378 | $1,008 | Implemented |
OR0168 # 06 Y:1993 | 06 | 1993 | KEEP BOILER TUBES CLEAN | $351 | $1,000 | Implemented |
OR0165 # 01 Y:1992 | 01 | 1992 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $4,045 | $500 | Implemented |
OR0165 # 02 Y:1992 | 02 | 1992 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,788 | $0 | Implemented |
OR0165 # 03 Y:1992 | 03 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,356 | $0 | Not Implemented |
OR0165 # 04 Y:1992 | 04 | 1992 | OPTIMIZE PLANT POWER FACTOR | $1,074 | $2,250 | Implemented |
OR0165 # 05 Y:1992 | 05 | 1992 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $830 | $0 | Implemented |
OR0165 # 06 Y:1992 | 06 | 1992 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $320 | $824 | Implemented |
OR0164 # 01 Y:1992 | 01 | 1992 | OPERATE BOILERS ON HIGH FIRE SETTING | $3,115 | $0 | Not Implemented |
OR0164 # 02 Y:1992 | 02 | 1992 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $1,608 | $0 | Implemented |
OR0164 # 03 Y:1992 | 03 | 1992 | RECOVER MECHANICAL ENERGY | $929 | $0 | Implemented |
OR0164 # 04 Y:1992 | 04 | 1992 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,042 | $500 | Implemented |
OR0164 # 05 Y:1992 | 05 | 1992 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $1,127 | $4,466 | Implemented |
OR0164 # 06 Y:1992 | 06 | 1992 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $10,419 | $0 | Not Implemented |
OR0156 # 01 Y:1992 | 01 | 1992 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $23,479 | $0 | Not Implemented |
OR0156 # 02 Y:1992 | 02 | 1992 | USE MINIMUM STEAM OPERATING PRESSURE | $473 | $0 | Implemented |
OR0156 # 03 Y:1992 | 03 | 1992 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,966 | $1,000 | Implemented |
OR0156 # 04 Y:1992 | 04 | 1992 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $200 | $0 | Implemented |
OR0156 # 05 Y:1992 | 05 | 1992 | INSTALL SET-BACK TIMERS | $387 | $360 | Not Implemented |
OR0156 # 06 Y:1992 | 06 | 1992 | RECOVER AND REUSE COOLING WATER | $3,527 | $5,105 | Implemented |
OR0156 # 07 Y:1992 | 07 | 1992 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $102 | $164 | Implemented |
OR0144 # 01 Y:1992 | 01 | 1992 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $685 | $0 | Not Implemented |
OR0144 # 02 Y:1992 | 02 | 1992 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $5,603 | $18,000 | Not Implemented |
OR0144 # 03 Y:1992 | 03 | 1992 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $899 | $1,000 | Implemented |
OR0144 # 04 Y:1992 | 04 | 1992 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $479 | $740 | Implemented |