Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
202
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0712 # 08 Y:2013 | 08 | 2013 | INSULATE BARE EQUIPMENT | $323 | $750 | Implemented |
MAS020 # 05 Y:2012 | 05 | 2012 | REDUCE EXCESS STEAM BLEEDING | $1,611 | $500 | Implemented |
MAS020 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $32,764 | $7,000 | Implemented |
MAS020 # 02 Y:2012 | 02 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $29,617 | $60,000 | Not Implemented |
MAS020 # 03 Y:2012 | 03 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,203 | $7,700 | Not Implemented |
MAS020 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,667 | $11,600 | Implemented |
MAS014 # 02 Y:2011 | 02 | 2011 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $15,371 | $17,325 | Not Implemented |
MAS014 # 03 Y:2011 | 03 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,256 | $8,190 | Not Implemented |
MAS014 # 04 Y:2011 | 04 | 2011 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $2,288 | $2,070 | Not Implemented |
MAS014 # 05 Y:2011 | 05 | 2011 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $2,033 | $200 | Not Implemented |
MAS014 # 06 Y:2011 | 06 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $496 | $700 | Not Implemented |
MAS014 # 07 Y:2011 | 07 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $493 | $200 | Not Implemented |
MAS014 # 01 Y:2011 | 01 | 2011 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $47,869 | $10,650 | Not Implemented |
MA0669 # 07 Y:2011 | 07 | 2011 | INSULATE BARE EQUIPMENT | $410 | $550 | Implemented |
MA0669 # 06 Y:2011 | 06 | 2011 | INSULATE BARE EQUIPMENT | $736 | $349 | Not Implemented |
MA0669 # 05 Y:2011 | 05 | 2011 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,576 | $25,250 | Not Implemented |
MA0669 # 04 Y:2011 | 04 | 2011 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,848 | $1,500 | Implemented |
MA0669 # 03 Y:2011 | 03 | 2011 | OPTIMIZE PLANT POWER FACTOR | $10,179 | $11,190 | Implemented |
MA0669 # 02 Y:2011 | 02 | 2011 | INSULATE BARE EQUIPMENT | $12,439 | $25,000 | Not Implemented |
MA0669 # 01 Y:2011 | 01 | 2011 | REPLACE BOILER | $28,774 | $63,300 | Implemented |
MA0664 # 01 Y:2010 | 01 | 2010 | OPTIMIZE PLANT POWER FACTOR | $133,570 | $55,950 | Implemented |
MA0664 # 02 Y:2010 | 02 | 2010 | MINIMIZE WATER USAGE | $26,438 | $62,000 | Not Implemented |
MA0664 # 03 Y:2010 | 03 | 2010 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $25,051 | $34,000 | Not Implemented |
MA0664 # 05 Y:2010 | 05 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,874 | $18,345 | Not Implemented |
MA0664 # 04 Y:2010 | 04 | 2010 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $17,890 | $95,000 | Not Implemented |