IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,706

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0291 # 04 Y:2002 04 2002 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $22,067 $40,280 Implemented
UF0291 # 05 Y:2002 05 2002 REPAIR AND ELIMINATE STEAM LEAKS $1,124 $450 Implemented
UF0291 # 06 Y:2002 06 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,424 $490 Implemented
UF0291 # 07 Y:2002 07 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $15,235 $25,190 Implemented
UF0291 # 08 Y:2002 08 2002 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $17,341 $2,600 Not Implemented
UF0291 # 09 Y:2002 09 2002 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,394 $20,000 Not Implemented
UF0291 # 10 Y:2002 10 2002 SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM $16,158 $0 Not Implemented
UF0291 # 11 Y:2002 11 2002 MOVE BOILER TO MORE EFFICIENT LOCATION $4,387 $0 Implemented
UF0291 # 12 Y:2002 12 2002 METER WASTE WATER $4,133 $1,500 Implemented
UF0291 # 13 Y:2002 13 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $2,309 $8,820 Not Implemented
UF0291 # 14 Y:2002 14 2002 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $12,120 $16,900 Not Implemented
IC0027 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,405 $4,651 Not Implemented
IC0027 # 02 Y:2002 02 2002 INSTALL OCCUPANCY SENSORS $497 $780 Not Implemented
IC0027 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,590 $500 Not Implemented
IC0027 # 04 Y:2002 04 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,379 $0 Not Implemented
IC0027 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,000 $750 Not Implemented
IC0027 # 06 Y:2002 06 2002 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $10,830 $33,832 Not Implemented
IC0027 # 07 Y:2002 07 2002 INSTALL EQUIPMENT TO MOVE PRODUCT $39,000 $240,000 Not Implemented
UF0289 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,791 $2,728 Implemented
UF0289 # 02 Y:2001 02 2001 INSTALL OCCUPANCY SENSORS $2,566 $1,457 Not Implemented
UF0289 # 03 Y:2001 03 2001 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $5,004 $6,175 Implemented
UF0289 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $869 $500 Implemented
UF0289 # 05 Y:2001 05 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,758 $11,274 Implemented
UF0289 # 06 Y:2001 06 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $389 $1,895 Not Implemented
UF0289 # 07 Y:2001 07 2001 INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM $35,100 $4,494 Implemented