IAC logo
IAC Assessment: UF0291
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0291
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2002
Principal Product Bottled Soft Drinks
NAICS n/a
SIC 2086 - Bottled And Canned Soft Drinks
Sales n/a
# of Employees 400
Plant Area (Sq.Ft.) 232,400
Annual Production 0 Pieces
Production Hrs. Annual 5,720
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $411,047 9,081,344 kWh $0.05
Electricity Demand $133,756 18,439 kW-months/year $7.25
Natural Gas $61,540 24,371 MMBtu $2.53
TOTAL ENERGY COSTS $606,343
RECOMMENDED SAVINGS* $125,791 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $63,042
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Administrative Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $ $ $
01: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$1,755
Cost:
$1,050
$406 9,023 $90 1 - - - - $1,259 - - - - - $406
9,023
kWh
$90
1
kW-months/year
-
-
MMBtu
-
-
Tgal
$1,259
-
$
-
-
$
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$4,427
Cost:
$192
$3,627 80,592 $800 9 - - - - - - - - - - $3,627
80,592
kWh
$800
9
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,917
Cost:
$6,752
$5,744 127,636 $1,173 13 - - - - - - - - - - $5,744
127,636
kWh
$1,173
13
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
04: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$22,067
Cost:
$40,280
$12,425 276,120 $10,266 118 - - - - - - $(-624) - - - $12,425
276,120
kWh
$10,266
118
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
$(-624)
-
$
-
-
$
05: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$1,124
Cost:
$450
- - - - $1,124 446 - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,124
446
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,424
Cost:
$490
$7,472 120,518 - - - - - - - - $(-48) - - - $7,472
120,518
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
$(-48)
-
$
-
-
$
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$15,235
Cost:
$25,190
$11,468 254,855 $3,767 43 - - - - - - - - - - $11,468
254,855
kWh
$3,767
43
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
08: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$17,341
Cost:
$2,600
- - - - $17,341 6,882 - - - - - - - - -
-
kWh
-
-
kW-months/year
$17,341
6,882
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
09: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$10,394
Cost:
$20,000
$8,515 189,216 $1,879 22 - - - - - - - - - - $8,515
189,216
kWh
$1,879
22
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
10: 2.2191 SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM Savings:
$16,158
Cost:
-
- - - - $16,158 15,841 - - - - - - - - -
-
kWh
-
-
kW-months/year
$16,158
15,841
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
11: 2.1211 MOVE BOILER TO MORE EFFICIENT LOCATION Savings:
$4,387
Cost:
-
- - - - $4,387 1,741 - - - - - - - - -
-
kWh
-
-
kW-months/year
$4,387
1,741
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
12: 3.4155 METER WASTE WATER Savings:
$4,133
Cost:
$1,500
- - - - - - $4,133 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,133
-
Tgal
-
-
$
-
-
$
-
-
$
13: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$2,309
Cost:
$8,820
- - - - - - - - - - - - $2,309 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
$2,309
-
$
14: 4.4320 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME Savings:
$12,120
Cost:
$16,900
- - - - - - - - - - - - $12,120 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
$12,120
-
$
TOTAL RECOMMENDED Savings:
$125,791
Cost:
$124,224
$49,657 1,057,960 $17,975 206 $39,010 24,910 $4,133 - $1,259 - $(-672) - $14,429 - $49,657
1,057,960
kWh
$17,975
206
kW-months/year
$39,010
24,910
MMBtu
$4,133
-
Tgal
$1,259
-
$
$(-672)
-
$
$14,429
-
$
TOTAL IMPLEMENTED Savings:
$63,042
Cost:
$75,712
$37,515 788,152 $15,296 175 $5,511 2,187 $4,133 - $1,259 - $(-672) - - - $37,515
788,152
kWh
$15,296
175
kW-months/year
$5,511
2,187
MMBtu
$4,133
-
Tgal
$1,259
-
$
$(-672)
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Administrative Changes One-time Revenue or Avoided Cost