Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Florida |
---|---|
Assessment Year | 2002 |
Principal Product | Bottled Soft Drinks |
NAICS | n/a |
SIC | 2086 - Bottled And Canned Soft Drinks |
Sales | n/a |
# of Employees | 400 |
Plant Area (Sq.Ft.) | 232,400 |
Annual Production | 0 Pieces |
Production Hrs. Annual | 5,720 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $411,047 | 9,081,344 | kWh | $0.05 |
Electricity Demand | $133,756 | 18,439 | kW-months/year | $7.25 |
Natural Gas | $61,540 | 24,371 | MMBtu | $2.53 |
TOTAL ENERGY COSTS | $606,343 | |||
RECOMMENDED SAVINGS* | $125,791 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $63,042 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Administrative Changes | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Administrative Changes | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $1,755 Cost: $1,050 |
$406 | 9,023 | $90 | 1 | - | - | - | - | $1,259 | - | - | - | - | - |
$406 9,023 kWh |
$90 1 kW-months/year |
- - MMBtu |
- - Tgal |
$1,259 - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $4,427 Cost: $192 |
$3,627 | 80,592 | $800 | 9 | - | - | - | - | - | - | - | - | - | - |
$3,627 80,592 kWh |
$800 9 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,917 Cost: $6,752 |
$5,744 | 127,636 | $1,173 | 13 | - | - | - | - | - | - | - | - | - | - |
$5,744 127,636 kWh |
$1,173 13 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT |
Savings: $22,067 Cost: $40,280 |
$12,425 | 276,120 | $10,266 | 118 | - | - | - | - | - | - | $(-624) | - | - | - |
$12,425 276,120 kWh |
$10,266 118 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
$(-624) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $1,124 Cost: $450 |
- | - | - | - | $1,124 | 446 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,124 446 MMBtu |
- - Tgal |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $7,424 Cost: $490 |
$7,472 | 120,518 | - | - | - | - | - | - | - | - | $(-48) | - | - | - |
$7,472 120,518 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
$(-48) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $15,235 Cost: $25,190 |
$11,468 | 254,855 | $3,767 | 43 | - | - | - | - | - | - | - | - | - | - |
$11,468 254,855 kWh |
$3,767 43 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER |
Savings: $17,341 Cost: $2,600 |
- | - | - | - | $17,341 | 6,882 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$17,341 6,882 MMBtu |
- - Tgal |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $10,394 Cost: $20,000 |
$8,515 | 189,216 | $1,879 | 22 | - | - | - | - | - | - | - | - | - | - |
$8,515 189,216 kWh |
$1,879 22 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.2191 SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM |
Savings: $16,158 Cost: - |
- | - | - | - | $16,158 | 15,841 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$16,158 15,841 MMBtu |
- - Tgal |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.1211 MOVE BOILER TO MORE EFFICIENT LOCATION |
Savings: $4,387 Cost: - |
- | - | - | - | $4,387 | 1,741 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$4,387 1,741 MMBtu |
- - Tgal |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 3.4155 METER WASTE WATER |
Savings: $4,133 Cost: $1,500 |
- | - | - | - | - | - | $4,133 | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$4,133 - Tgal |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $2,309 Cost: $8,820 |
- | - | - | - | - | - | - | - | - | - | - | - | $2,309 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
$2,309 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 4.432 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME |
Savings: $12,120 Cost: $16,900 |
- | - | - | - | - | - | - | - | - | - | - | - | $12,120 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
$12,120 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $125,791 Cost: $124,224 |
$49,657 | 1,057,960 | $17,975 | 206 | $39,010 | 24,910 | $4,133 | - | $1,259 | - | $(-672) | - | $14,429 | - | $49,657 1,057,960 kWh |
$17,975 206 kW-months/year |
$39,010 24,910 MMBtu |
$4,133 - Tgal |
$1,259 - $ |
$(-672) - $ |
$14,429 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $63,042 Cost: $75,712 |
$37,515 | 788,152 | $15,296 | 175 | $5,511 | 2,187 | $4,133 | - | $1,259 | - | $(-672) | - | - | - | $37,515 788,152 kWh |
$15,296 175 kW-months/year |
$5,511 2,187 MMBtu |
$4,133 - Tgal |
$1,259 - $ |
$(-672) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Administrative Changes | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Administrative Changes | One-time Revenue or Avoided Cost |