Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20,785
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LT8363 # 01 Y:2022 | 01 | 2022 | OPTIMIZE PLANT POWER FACTOR | $5,980 | $10,022 | n/a |
LT8363 # 02 Y:2022 | 02 | 2022 | CHANGE OPERATING CONDITIONS | $46,622 | $0 | n/a |
LT8363 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,542 | $2,945 | n/a |
LT8363 # 04 Y:2022 | 04 | 2022 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $14,468 | $15,975 | n/a |
LT8363 # 05 Y:2022 | 05 | 2022 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $22,308 | $32,500 | n/a |
LT8363 # 06 Y:2022 | 06 | 2022 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $23,817 | $51,385 | n/a |
LT8363 # 07 Y:2022 | 07 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,254 | $0 | n/a |
SF0591 # 01 Y:2022 | 01 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,537 | $0 | Not Implemented |
SF0591 # 02 Y:2022 | 02 | 2022 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $9,922 | $0 | Implemented |
SF0591 # 03 Y:2022 | 03 | 2022 | REDUCE EXCESS STEAM BLEEDING | $9,616 | $0 | Implemented |
SF0591 # 04 Y:2022 | 04 | 2022 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $6,698 | $0 | Implemented |
SF0591 # 05 Y:2022 | 05 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $814 | $268 | Not Implemented |
SF0591 # 06 Y:2022 | 06 | 2022 | INSTALL SET-BACK TIMERS | $22,648 | $6,467 | Implemented |
SF0591 # 07 Y:2022 | 07 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,540 | $14,724 | Implemented |
SF0591 # 08 Y:2022 | 08 | 2022 | INSULATE FEEDWATER TANK | $1,806 | $4,445 | Not Implemented |
SF0591 # 09 Y:2022 | 09 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,521 | $18,051 | Implemented |
SF0591 # 10 Y:2022 | 10 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $47,418 | $177,700 | Not Implemented |
SF0591 # 11 Y:2022 | 11 | 2022 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $35,700 | $132,000 | Not Implemented |
UW2207 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,161 | $0 | Implemented |
UW2207 # 02 Y:2022 | 02 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $685 | $112 | Implemented |
UW2207 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,582 | $12,124 | Not Implemented |
UW2207 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,631 | $2,080 | Implemented |
UF0585 # 01 Y:2022 | 01 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $21,858 | $44,939 | Implemented |
UF0585 # 02 Y:2022 | 02 | 2022 | INCREASE AMOUNT OF CONDENSATE RETURNED | $11,758 | $1,342 | Implemented |
UF0585 # 03 Y:2022 | 03 | 2022 | INSTALL TURBULATORS | $6,811 | $7,500 | Implemented |