IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

595

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0156 # 03 Y:2014 03 2014 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,460 $400 Implemented
MZ0156 # 02 Y:2014 02 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,480 $2,000 Implemented
MZ0156 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,514 $71,320 Implemented
MZ0155 # 04 Y:2014 04 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,228 $750 Not Implemented
MZ0155 # 01 Y:2014 01 2014 RECOVER WASTE HEAT FROM EQUIPMENT $10,080 $1,350 Not Implemented
MZ0155 # 02 Y:2014 02 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,171 $1,000 Not Implemented
MZ0155 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,118 $1,525 Not Implemented
MZ0141 # 08 Y:2014 08 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,940 $0 Implemented
MZ0141 # 07 Y:2014 07 2014 INSTALL OCCUPANCY SENSORS $10,446 $1,875 Not Implemented
MZ0141 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,518 $21,850 Implemented
MZ0141 # 05 Y:2014 05 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $11,440 $2,500 Not Implemented
MZ0141 # 04 Y:2014 04 2014 RECOVER WASTE HEAT FROM EQUIPMENT $4,000 $6,000 Not Implemented
MZ0141 # 03 Y:2014 03 2014 RECOVER WASTE HEAT FROM EQUIPMENT $3,254 $11,500 Not Implemented
MZ0141 # 02 Y:2014 02 2014 LOWER CEILING TO REDUCE CONDITIONED SPACE $12,947 $24,000 Not Implemented
MZ0141 # 01 Y:2014 01 2014 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $2,625 $7,000 Implemented
MZ0136 # 06 Y:2014 06 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,112 $2,840 Not Implemented
MZ0136 # 01 Y:2014 01 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $16,626 $290 Implemented
MZ0136 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $672 $1,600 Implemented
MZ0136 # 03 Y:2014 03 2014 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $282 $50 Implemented
MZ0136 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,785 $18,300 Implemented
MZ0136 # 08 Y:2014 08 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $44,793 $7,900 Not Implemented
MZ0136 # 05 Y:2014 05 2014 INSTALL OCCUPANCY SENSORS $16,863 $910 Implemented
MZ0136 # 09 Y:2014 09 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,564 $0 Not Implemented
MZ0136 # 07 Y:2014 07 2014 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $13,943 $63,000 Not Implemented
MZ0132 # 06 Y:2013 06 2013 RECOVER WASTE HEAT FROM EQUIPMENT $5,895 $2,000 Not Implemented