IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,689

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0050 # 01 Y:1993 01 1993 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $3,114 $4,500 Not Implemented
IA0050 # 02 Y:1993 02 1993 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $1,319 $2,500 Implemented
IA0050 # 03 Y:1993 03 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $655 $60 Not Implemented
IA0050 # 04 Y:1993 04 1993 INSULATE BARE EQUIPMENT $1,872 $2,000 Not Implemented
IA0050 # 05 Y:1993 05 1993 INSULATE BARE EQUIPMENT $446 $100 Not Implemented
IA0050 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $686 $234 Implemented
IA0050 # 07 Y:1993 07 1993 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $93 $0 Implemented
KU0393 # 01 Y:1993 01 1993 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $14,813 $23,600 Not Implemented
KU0393 # 02 Y:1993 02 1993 USE STEAM SPARGING OR INJECTIONS IN PLACE OF INDIRECT HEATING $5,295 $6,925 Not Implemented
KU0393 # 03 Y:1993 03 1993 OPTIMIZE PLANT POWER FACTOR $4,164 $11,320 Implemented
KU0393 # 04 Y:1993 04 1993 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,913 $14,300 Not Implemented
KU0393 # 05 Y:1993 05 1993 INSULATE BARE EQUIPMENT $574 $1,800 Not Implemented
KU0393 # 06 Y:1993 06 1993 INSTALL OCCUPANCY SENSORS $344 $800 Not Implemented
KU0393 # 07 Y:1993 07 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $316 $60 Not Implemented
KU0393 # 08 Y:1993 08 1993 INSTALL TIMERS AND/OR THERMOSTATS $123 $235 Not Implemented
IA0049 # 01 Y:1993 01 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,746 $11,812 Implemented
IA0049 # 02 Y:1993 02 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $26,422 $79,610 Implemented
IA0049 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,833 $2,623 Implemented
IA0049 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,760 $500 Implemented
IA0049 # 05 Y:1993 05 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $284 $150 Not Implemented
IA0049 # 06 Y:1993 06 1993 RECOVER AND REUSE COOLING WATER $15,028 $30,000 Not Implemented
OR0168 # 01 Y:1993 01 1993 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $2,253 $0 Implemented
OR0168 # 02 Y:1993 02 1993 OPERATE BOILERS ON HIGH FIRE SETTING $134 $0 Implemented
OR0168 # 03 Y:1993 03 1993 HEAT WATER WITH EXHAUST HEAT $3,366 $500 Implemented
OR0168 # 04 Y:1993 04 1993 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,200 $1,152 Implemented