IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,689

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0156 # 02 Y:1992 02 1992 OPTIMIZE PLANT POWER FACTOR $10,125 $1,500 Implemented
AM0156 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,117 $3,200 Implemented
AM0156 # 04 Y:1992 04 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,040 $860 Implemented
AM0156 # 05 Y:1992 05 1992 INSTALL SET-BACK TIMERS $2,900 $0 Implemented
AM0156 # 06 Y:1992 06 1992 IMPROVE LUBRICATION PRACTICES $1,430 $0 Not Implemented
MO0061 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,377 $18,250 Implemented
MO0061 # 02 Y:1992 02 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,981 $1,170 Implemented
MO0061 # 03 Y:1992 03 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $11,628 $1,240 Implemented
MO0061 # 04 Y:1992 04 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,403 $20 Not Implemented
MO0061 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,455 $14,300 Implemented
MO0061 # 06 Y:1992 06 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,545 $688 Implemented
UF0034 # 01 Y:1992 01 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,358 $0 Not Implemented
UF0034 # 02 Y:1992 02 1992 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $11,737 $14,960 Not Implemented
UF0034 # 03 Y:1992 03 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,962 $18,601 Implemented
UF0034 # 04 Y:1992 04 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,299 $400 Implemented
UF0034 # 05 Y:1992 05 1992 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $51,194 $68,400 Not Implemented
UF0034 # 06 Y:1992 06 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,213 $1,000 Implemented
UF0034 # 07 Y:1992 07 1992 RECOVER WASTE HEAT FROM EQUIPMENT $7,986 $5,200 Implemented
UF0036 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $332 $282 Not Implemented
UF0036 # 02 Y:1992 02 1992 INSTALL SPECTRAL REFLECTORS / DELAMP $3,496 $12,120 Not Implemented
UF0036 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $477 $1,603 Not Implemented
UF0036 # 04 Y:1992 04 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $21 $4,164 Not Implemented
UF0036 # 05 Y:1992 05 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $29 $75 Not Implemented
UF0036 # 06 Y:1992 06 1992 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $24,728 $42,000 Not Implemented
OK0385 # 01 Y:1992 01 1992 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $265 $280 Implemented