Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
227
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0312 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,355 | $15,984 | Not Implemented |
UM0312 # 04 Y:2006 | 04 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,421 | $100 | Not Implemented |
UM0312 # 05 Y:2006 | 05 | 2006 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,885 | $2,250 | Implemented |
UM0312 # 06 Y:2006 | 06 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,862 | $200 | Not Implemented |
UM0312 # 07 Y:2006 | 07 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,826 | $1,300 | Not Implemented |
UM0312 # 08 Y:2006 | 08 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,622 | $800 | Not Implemented |
UM0312 # 09 Y:2006 | 09 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $857 | $300 | Not Implemented |
UM0312 # 10 Y:2006 | 10 | 2006 | INSTALL OCCUPANCY SENSORS | $508 | $276 | Not Implemented |
UM0283 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,568 | $6,878 | Implemented |
UM0283 # 02 Y:2005 | 02 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,056 | $2,500 | Implemented |
UM0283 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,024 | $300 | Implemented |
UM0283 # 04 Y:2005 | 04 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $873 | $3,000 | Not Implemented |
UM0283 # 05 Y:2005 | 05 | 2005 | AIR CONDITION ONLY SPACE NECESSARY | $793 | $2,117 | Not Implemented |
UM0245 # 01 Y:2004 | 01 | 2004 | REDUCE SCRAP PRODUCTION | $21,060 | $2,288 | Not Implemented |
UM0245 # 02 Y:2004 | 02 | 2004 | REPLACE BOILER | $13,000 | $34,000 | Not Implemented |
UM0245 # 03 Y:2004 | 03 | 2004 | INSULATE BARE EQUIPMENT | $7,445 | $3,985 | Not Implemented |
UM0245 # 04 Y:2004 | 04 | 2004 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $6,060 | $12,288 | Implemented |
UM0245 # 05 Y:2004 | 05 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,670 | $500 | Not Implemented |
UM0245 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,500 | $7,700 | Not Implemented |
UM0245 # 07 Y:2004 | 07 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,340 | $225 | Implemented |
UM0245 # 08 Y:2004 | 08 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $990 | $1,000 | Not Implemented |
UM0231 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,750 | $7,445 | Not Implemented |
UM0231 # 02 Y:2003 | 02 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,000 | $2,250 | Not Implemented |
UM0231 # 03 Y:2003 | 03 | 2003 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,320 | $1,500 | Not Implemented |
UM0231 # 04 Y:2003 | 04 | 2003 | HEAT WATER WITH EXHAUST HEAT | $6,519 | $7,500 | Not Implemented |