IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,785

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0017 # 02 Y:1991 02 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $17,734 $5,100 Not Implemented
MO0017 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $705 $1,087 Not Implemented
MO0017 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,750 $570 Not Implemented
MO0017 # 05 Y:1991 05 1991 MINIMIZE WATER USAGE $1,269 $0 Not Implemented
MO0017 # 06 Y:1991 06 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,117 $220 Not Implemented
MO0017 # 07 Y:1991 07 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $698 $1,195 Not Implemented
MO0017 # 08 Y:1991 08 1991 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $586 $40 Not Implemented
CO0205 # 07 Y:1991 07 1991 INSTALL TIMERS AND/OR THERMOSTATS $440 $300 Not Implemented
CO0203 # 01 Y:1991 01 1991 INCREASE AMOUNT OF CONDENSATE RETURNED $31,100 $0 Implemented
CO0203 # 02 Y:1991 02 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $16,000 $3,800 Implemented
CO0203 # 03 Y:1991 03 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,165 $7,200 Implemented
CO0203 # 04 Y:1991 04 1991 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,600 $16,000 Implemented
CO0203 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,200 $2,400 Implemented
CO0203 # 06 Y:1991 06 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $750 $1,400 Implemented
CO0203 # 07 Y:1991 07 1991 HEAT WATER WITH EXHAUST HEAT $4,300 $11,000 Implemented
CO0203 # 08 Y:1991 08 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,400 $2,000 Implemented
CO0203 # 09 Y:1991 09 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,700 $5,600 Implemented
CO0203 # 10 Y:1991 10 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,000 $700 Implemented
CO0203 # 11 Y:1991 11 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $400 $1,500 Implemented
CO0203 # 12 Y:1991 12 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $840 $1,300 Implemented
CO0203 # 13 Y:1991 13 1991 INSTALL TIMERS AND/OR THERMOSTATS $660 $900 Implemented
CO0203 # 14 Y:1991 14 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $540 $200 Implemented
CO0203 # 15 Y:1991 15 1991 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,000 $1,700 Implemented
CO0203 # 16 Y:1991 16 1991 INSULATE BARE EQUIPMENT $1,300 $1,800 Implemented
CO0205 # 01 Y:1991 01 1991 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $10,700 $6,500 Not Implemented