Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20,785
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0205 # 02 Y:1991 | 02 | 1991 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,331 | $2,240 | Not Implemented |
CO0205 # 03 Y:1991 | 03 | 1991 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,600 | $500 | Not Implemented |
CO0205 # 04 Y:1991 | 04 | 1991 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,100 | $2,000 | Not Implemented |
CO0205 # 05 Y:1991 | 05 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,600 | $400 | Not Implemented |
CO0205 # 06 Y:1991 | 06 | 1991 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,300 | $3,100 | Not Implemented |
AM0112 # 01 Y:1991 | 01 | 1991 | MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT | $2,470 | $5,000 | Not Implemented |
AM0112 # 02 Y:1991 | 02 | 1991 | USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM | $4,670 | $19,000 | Not Implemented |
AM0112 # 03 Y:1991 | 03 | 1991 | REPAIR AND ELIMINATE STEAM LEAKS | $3,900 | $365 | Not Implemented |
AM0112 # 04 Y:1991 | 04 | 1991 | INSTALL / REPAIR INSULATION ON STEAM LINES | $340 | $310 | Not Implemented |
AM0112 # 05 Y:1991 | 05 | 1991 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $195 | $235 | Not Implemented |
MA0201 # 01 Y:1991 | 01 | 1991 | INSULATE BARE EQUIPMENT | $2,084 | $1,762 | Not Implemented |
MA0201 # 02 Y:1991 | 02 | 1991 | INSULATE BARE EQUIPMENT | $2,084 | $1,762 | Not Implemented |
MA0201 # 03 Y:1991 | 03 | 1991 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $159,131 | $425,925 | Not Implemented |
MA0201 # 04 Y:1991 | 04 | 1991 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $2,784 | $500 | Not Implemented |
OR0100 # 01 Y:1990 | 01 | 1990 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $22,304 | $0 | Implemented |
OR0100 # 02 Y:1990 | 02 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,888 | $2,677 | Not Implemented |
OR0100 # 03 Y:1990 | 03 | 1990 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,591 | $2,350 | Not Implemented |
OR0100 # 04 Y:1990 | 04 | 1990 | OPTIMIZE PLANT POWER FACTOR | $6,420 | $13,800 | Implemented |
KU0329 # 01 Y:1990 | 01 | 1990 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $2,299 | $1,500 | Implemented |
KU0329 # 02 Y:1990 | 02 | 1990 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $4,269 | $6,000 | Implemented |
KU0329 # 03 Y:1990 | 03 | 1990 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $7,435 | $9,600 | Not Implemented |
KU0329 # 04 Y:1990 | 04 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $394 | $700 | Implemented |
KU0329 # 05 Y:1990 | 05 | 1990 | INSTALL SET-BACK TIMERS | $523 | $400 | Implemented |
KU0329 # 06 Y:1990 | 06 | 1990 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,025 | $0 | Implemented |
KU0329 # 07 Y:1990 | 07 | 1990 | INSULATE BARE EQUIPMENT | $3,165 | $2,804 | Implemented |