IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,785

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0370 # 07 Y:1989 07 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $415 $150 Implemented
GT0370 # 08 Y:1989 08 1989 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $109,742 $128,000 Implemented
UD0284 # 01 Y:1989 01 1989 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $38,356 $20,000 Implemented
UD0284 # 02 Y:1989 02 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,285 $0 Implemented
UD0284 # 03 Y:1989 03 1989 INSTALL STORM WINDOWS AND DOORS $14,561 $55,000 Not Implemented
UD0284 # 04 Y:1989 04 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,210 $0 Implemented
UD0284 # 05 Y:1989 05 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,648 $0 Implemented
UD0284 # 06 Y:1989 06 1989 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,404 $2,300 Implemented
UD0284 # 07 Y:1989 07 1989 USE DEMAND CONTROLLER OR LOAD SHEDDER $5,361 $23,000 Not Implemented
AM0056 # 01 Y:1989 01 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,790 $7,577 Not Implemented
AM0056 # 02 Y:1989 02 1989 RECOVER WASTE HEAT FROM EQUIPMENT $1,070 $700 Implemented
AM0056 # 03 Y:1989 03 1989 INSTALL SET-BACK TIMERS $970 $0 Implemented
AM0056 # 04 Y:1989 04 1989 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $849 $960 Not Implemented
AM0056 # 05 Y:1989 05 1989 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $430 $0 Not Implemented
AM0056 # 06 Y:1989 06 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $250 $250 Implemented
AM0056 # 07 Y:1989 07 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $200 $250 Not Implemented
AM0056 # 08 Y:1989 08 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20 $4 Implemented
GT0368 # 01 Y:1989 01 1989 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $13,200 $45,000 Implemented
GT0368 # 02 Y:1989 02 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,370 $500 Implemented
GT0368 # 03 Y:1989 03 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,700 $10,000 Not Implemented
GT0368 # 04 Y:1989 04 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $630 $4,287 Not Implemented
GT0368 # 05 Y:1989 05 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,720 $0 Not Implemented
GT0368 # 06 Y:1989 06 1989 HEAT WATER WITH EXHAUST HEAT $50,190 $20,000 Implemented
KU0272 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,054 $500 Not Implemented
KU0272 # 02 Y:1989 02 1989 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $1,242 $300 Implemented