IAC logo
IAC Assessment: AM0056
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0056
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1989
Principal Product LIVESTOCK & POULTRY FEED
NAICS n/a
SIC 2048 - Prepared Feeds, Nec
Sales $5,000,000-$10,000,000
# of Employees 40
Plant Area (Sq.Ft.) 0
Annual Production 140,000 Tons
Production Hrs. Annual 6,072
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $73,582 1,657,972 kWh $0.04
Natural Gas $26,141 6,616 MMBtu $3.95
TOTAL ENERGY COSTS $99,723
RECOMMENDED SAVINGS* $8,579 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,310
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$4,790
Cost:
$7,577
$(-372) (-11,430) $5,162 1,307 $(-372)
(-11,430)
kWh
$5,162
1,307
MMBtu
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,070
Cost:
$700
- - $1,070 270 -
-
kWh
$1,070
270
MMBtu
03: 2.6232 INSTALL SET-BACK TIMERS Savings:
$970
Cost:
-
$970 16,706 - - $970
16,706
kWh
-
-
MMBtu
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$849
Cost:
$960
$849 26,084 - - $849
26,084
kWh
-
-
MMBtu
05: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$430
Cost:
-
$430 - - - $430
-
kWh
-
-
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$250
Cost:
$250
$250 10,258 - - $250
10,258
kWh
-
-
MMBtu
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$200
Cost:
$250
$200 8,499 - - $200
8,499
kWh
-
-
MMBtu
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$20
Cost:
$4
$20 586 - - $20
586
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$8,579
Cost:
$9,741
$2,347 50,703 $6,232 1,577 $2,347
50,703
kWh
$6,232
1,577
MMBtu
TOTAL IMPLEMENTED Savings:
$2,310
Cost:
$954
$1,240 27,550 $1,070 270 $1,240
27,550
kWh
$1,070
270
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas