IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

741

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0861 # 02 Y:2009 02 2009 USE MINIMUM SAFE OVEN VENTILATION $246,400 $5,600 Not Implemented
GT0861 # 03 Y:2009 03 2009 ADJUST BURNERS FOR EFFICIENT OPERATION $38,729 $40,000 Implemented
GT0861 # 04 Y:2009 04 2009 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,626 $0 Not Implemented
GT0861 # 05 Y:2009 05 2009 INSULATE BARE EQUIPMENT $98,000 $244,260 Implemented
GT0861 # 06 Y:2009 06 2009 INSULATE BARE EQUIPMENT $6,025 $951 Implemented
GT0861 # 07 Y:2009 07 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,257 $2,400 Not Implemented
GT0861 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,345 $17,129 Not Implemented
GT0861 # 09 Y:2009 09 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,933 $60,324 Not Implemented
GT0861 # 10 Y:2009 10 2009 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $83,157 $231,450 Not Implemented
GT0860 # 01 Y:2009 01 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $10,513 $6,050 Implemented
GT0860 # 02 Y:2009 02 2009 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,661 $1,000 Implemented
GT0860 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,730 $1,000 Implemented
GT0860 # 04 Y:2009 04 2009 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $4,140 $6,750 Not Implemented
GT0860 # 05 Y:2009 05 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,419 $7,066 Implemented
GT0860 # 06 Y:2009 06 2009 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,213 $12,000 Not Implemented
GT0860 # 07 Y:2009 07 2009 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,199 $4,250 Not Implemented
GT0860 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,084 $16,350 Implemented
GT0860 # 09 Y:2009 09 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,361 $14,795 Implemented
GT0857 # 01 Y:2008 01 2008 REPAIR OR REPLACE STEAM TRAPS $21,870 $12,000 Not Implemented
GT0857 # 02 Y:2008 02 2008 RECOVER WASTE HEAT FROM EQUIPMENT $142,150 $130,500 Not Implemented
GT0857 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,834 $29,404 Not Implemented
GT0857 # 04 Y:2008 04 2008 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $6,781 $20,000 Not Implemented
GT0857 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $42,655 $119,957 Not Implemented
GT0857 # 06 Y:2008 06 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,243 $1,636 Not Implemented
GT0857 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,400 $30,135 Not Implemented