IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

443

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0274 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,342 $7,035 Not Implemented
MS0274 # 09 Y:2005 09 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,636 $5,788 Not Implemented
MS0274 # 10 Y:2005 10 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,135 $0 Not Implemented
MS0274 # 11 Y:2005 11 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $672 $223 Not Implemented
MS0274 # 12 Y:2005 12 2005 AIR CONDITION ONLY SPACE NECESSARY $425 $120 Not Implemented
GT0769 # 01 Y:2003 01 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,386 $41,000 n/a
GT0769 # 02 Y:2003 02 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $12,813 $0 n/a
GT0769 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $3,157 $2,000 n/a
GT0769 # 04 Y:2003 04 2003 REPAIR AND ELIMINATE STEAM LEAKS $2,457 $300 n/a
GT0769 # 05 Y:2003 05 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,869 $2,137 n/a
TN0650 # 01 Y:1999 01 1999 MODIFY CURRENT INCENTIVE PROGRAM $150,000 $30,000 Not Implemented
TN0650 # 02 Y:1999 02 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,400 $0 Implemented
TN0650 # 03 Y:1999 03 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $8,150 $0 Implemented
TN0650 # 04 Y:1999 04 1999 INSULATE BARE EQUIPMENT $6,220 $2,180 Not Implemented
TN0650 # 05 Y:1999 05 1999 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $6,350 $36,000 Not Implemented
TN0650 # 06 Y:1999 06 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,960 $16,600 Not Implemented
TN0650 # 07 Y:1999 07 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $39,640 $30,500 Not Implemented
TN0650 # 08 Y:1999 08 1999 USE MINIMUM STEAM OPERATING PRESSURE $5,280 $0 Not Implemented
TN0650 # 09 Y:1999 09 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,555 $1,120 Not Implemented
TN0671 # 01 Y:1999 01 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $250,000 $2,030 Not Implemented
TN0671 # 02 Y:1999 02 1999 INSTALL EQUIPMENT TO MOVE PRODUCT $108,400 $34,670 Not Implemented
TN0671 # 03 Y:1999 03 1999 MODIFY CURRENT INCENTIVE PROGRAM $45,000 $16,375 Not Implemented
TN0671 # 04 Y:1999 04 1999 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $28,195 $1,075 Not Implemented
TN0671 # 05 Y:1999 05 1999 SELL / OFFER BY-PRODUCT AS ANIMAL FEED $21,560 $0 Not Implemented
TN0671 # 06 Y:1999 06 1999 OPTIMIZE PLANT POWER FACTOR $4,000 $13,000 Not Implemented