IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

507

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0257 # 12 Y:2018 12 2018 MINIMIZE WATER USAGE $37,478 $0 Implemented
SF0526 # 01 Y:2018 01 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,234 $70 Not Implemented
SF0526 # 02 Y:2018 02 2018 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $6,043 $1,093 Implemented
SF0526 # 03 Y:2018 03 2018 INSULATE BARE EQUIPMENT $2,520 $1,157 Implemented
SF0526 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,205 $16,016 Implemented
SF0526 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,669 $5,876 Implemented
SF0526 # 06 Y:2018 06 2018 INSULATE BARE EQUIPMENT $8,414 $20,536 Implemented
SF0526 # 07 Y:2018 07 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,959 $22,846 Not Implemented
UU0137 # 01 Y:2018 01 2018 RECOVER WASTE HEAT FROM EQUIPMENT $48,448 $23,000 Not Implemented
UU0137 # 02 Y:2018 02 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $37,021 $24,600 Implemented
UU0137 # 03 Y:2018 03 2018 RECOVER WASTE HEAT FROM EQUIPMENT $26,521 $17,000 Implemented
UU0137 # 04 Y:2018 04 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $11,622 $7,600 Implemented
UU0137 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,310 $7,650 Implemented
UU0137 # 06 Y:2018 06 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $973 $3,500 Implemented
BS0111 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,853 $2,250 Implemented
BS0111 # 02 Y:2018 02 2018 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS $768 $1,485 Implemented
BS0111 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,707 $2,970 Implemented
BS0111 # 04 Y:2018 04 2018 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $10,878 $1,225 Implemented
BS0111 # 05 Y:2018 05 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,250 $60 Implemented
BS0111 # 06 Y:2018 06 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,713 $20 Implemented
BS0111 # 07 Y:2018 07 2018 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $130,754 $100,744 Not Implemented
LS1809 # 01 Y:2018 01 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,090 $100 Not Implemented
LS1809 # 02 Y:2018 02 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $134 $45 Not Implemented
LS1809 # 03 Y:2018 03 2018 INSTALL OCCUPANCY SENSORS $401 $300 Not Implemented
LS1809 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,902 $4,019 Not Implemented