Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20,785
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0233 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $260 | $1,068 | Implemented |
UA0233 # 04 Y:2020 | 04 | 2020 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,500 | $20 | Implemented |
UA0233 # 05 Y:2020 | 05 | 2020 | INSTALL OCCUPANCY SENSORS | $658 | $185 | Implemented |
UA0233 # 06 Y:2020 | 06 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $104 | $830 | Not Implemented |
UA0233 # 07 Y:2020 | 07 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $39 | $25 | Not Implemented |
SF0558 # 01 Y:2020 | 01 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,941 | $0 | Implemented |
SF0558 # 02 Y:2020 | 02 | 2020 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $98,999 | $34,416 | Implemented |
SF0558 # 03 Y:2020 | 03 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,186 | $525 | Not Implemented |
SF0558 # 04 Y:2020 | 04 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,252 | $4,542 | Implemented |
SF0558 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,759 | $2,995 | Implemented |
SF0558 # 06 Y:2020 | 06 | 2020 | INSULATE BARE EQUIPMENT | $282 | $379 | Implemented |
SF0558 # 07 Y:2020 | 07 | 2020 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $30,342 | $50,211 | Not Implemented |
SF0558 # 08 Y:2020 | 08 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,149 | $6,701 | Not Implemented |
SF0558 # 09 Y:2020 | 09 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $145 | $591 | Implemented |
SF0558 # 10 Y:2020 | 10 | 2020 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $9,006 | $75,000 | Not Implemented |
UK2004 # 01 Y:2020 | 01 | 2020 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $6,031 | $21,360 | Implemented |
UK2004 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,779 | $0 | Implemented |
UK2004 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,067 | $2,630 | Implemented |
UK2004 # 04 Y:2020 | 04 | 2020 | INCREASE AMOUNT OF CONDENSATE RETURNED | $360,000 | $250,000 | Implemented |
UK2004 # 05 Y:2020 | 05 | 2020 | INSULATE BARE EQUIPMENT | $52,668 | $24,890 | Implemented |
UK2004 # 06 Y:2020 | 06 | 2020 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $71,487 | $150,900 | Implemented |
UK2004 # 07 Y:2020 | 07 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $102,672 | $4,000 | Implemented |
UK2004 # 08 Y:2020 | 08 | 2020 | ELIMINATE A BY-PRODUCT | $293,614 | $53,800 | Not Implemented |
UK2004 # 09 Y:2020 | 09 | 2020 | OPTIMIZE PLANT POWER FACTOR | $40,258 | $23,660 | Implemented |
UK2003 # 01 Y:2020 | 01 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $486 | $2,200 | Not Implemented |