Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20,785
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0154 # 06 Y:1985 | 06 | 1985 | INSTALL AUTOMATIC STACK DAMPER | $1,854 | $700 | Not Implemented |
KU0154 # 07 Y:1985 | 07 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $974 | $0 | Implemented |
KU0154 # 08 Y:1985 | 08 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $2,887 | $1,200 | Implemented |
KU0154 # 09 Y:1985 | 09 | 1985 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $739 | $100 | Not Implemented |
KU0154 # 10 Y:1985 | 10 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $262 | $20 | Not Implemented |
KU0154 # 11 Y:1985 | 11 | 1985 | ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE | $279 | $0 | Implemented |
KU0154 # 12 Y:1985 | 12 | 1985 | REPAIR AND ELIMINATE STEAM LEAKS | $108 | $50 | Implemented |
KU0156 # 01 Y:1985 | 01 | 1985 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $93,873 | $350,000 | Not Implemented |
KU0156 # 02 Y:1985 | 02 | 1985 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $9,544 | $3,342 | Implemented |
KU0156 # 03 Y:1985 | 03 | 1985 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $6,350 | $2,500 | Not Implemented |
KU0156 # 04 Y:1985 | 04 | 1985 | REPLACE STEAM JETS ON VACUUM SYSTEM WITH ELECTRIC MOTOR DRIVEN VACUUM PUMPS | $1,428 | $2,000 | Not Implemented |
KU0156 # 05 Y:1985 | 05 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,064 | $2,200 | Implemented |
KU0156 # 06 Y:1985 | 06 | 1985 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $5,611 | $1,200 | Implemented |
KU0156 # 07 Y:1985 | 07 | 1985 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $6,298 | $1,200 | Implemented |
KU0156 # 08 Y:1985 | 08 | 1985 | INSULATE BARE EQUIPMENT | $311 | $187 | Not Implemented |
KU0156 # 09 Y:1985 | 09 | 1985 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,323 | $0 | Not Implemented |
KU0156 # 10 Y:1985 | 10 | 1985 | ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE | $239 | $0 | Not Implemented |
KU0156 # 11 Y:1985 | 11 | 1985 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $141 | $40 | Not Implemented |
MA0022 # 01 Y:1985 | 01 | 1985 | HEAT WATER WITH EXHAUST HEAT | $2,163 | $1,875 | Not Implemented |
MA0022 # 02 Y:1985 | 02 | 1985 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $753 | $1,827 | Implemented |
MA0022 # 03 Y:1985 | 03 | 1985 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $160 | $154 | Implemented |
MA0022 # 04 Y:1985 | 04 | 1985 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $283 | $0 | Implemented |
MA0022 # 05 Y:1985 | 05 | 1985 | OPTIMIZE PLANT POWER FACTOR | $432 | $289 | Implemented |
MA0022 # 06 Y:1985 | 06 | 1985 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,060 | $1,190 | Not Implemented |
CO0016 # 01 Y:1985 | 01 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,955 | $1,548 | Implemented |