IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,785

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0154 # 06 Y:1985 06 1985 INSTALL AUTOMATIC STACK DAMPER $1,854 $700 Not Implemented
KU0154 # 07 Y:1985 07 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $974 $0 Implemented
KU0154 # 08 Y:1985 08 1985 INSTALL TIMERS AND/OR THERMOSTATS $2,887 $1,200 Implemented
KU0154 # 09 Y:1985 09 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $739 $100 Not Implemented
KU0154 # 10 Y:1985 10 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $262 $20 Not Implemented
KU0154 # 11 Y:1985 11 1985 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $279 $0 Implemented
KU0154 # 12 Y:1985 12 1985 REPAIR AND ELIMINATE STEAM LEAKS $108 $50 Implemented
KU0156 # 01 Y:1985 01 1985 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $93,873 $350,000 Not Implemented
KU0156 # 02 Y:1985 02 1985 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $9,544 $3,342 Implemented
KU0156 # 03 Y:1985 03 1985 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $6,350 $2,500 Not Implemented
KU0156 # 04 Y:1985 04 1985 REPLACE STEAM JETS ON VACUUM SYSTEM WITH ELECTRIC MOTOR DRIVEN VACUUM PUMPS $1,428 $2,000 Not Implemented
KU0156 # 05 Y:1985 05 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,064 $2,200 Implemented
KU0156 # 06 Y:1985 06 1985 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $5,611 $1,200 Implemented
KU0156 # 07 Y:1985 07 1985 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $6,298 $1,200 Implemented
KU0156 # 08 Y:1985 08 1985 INSULATE BARE EQUIPMENT $311 $187 Not Implemented
KU0156 # 09 Y:1985 09 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,323 $0 Not Implemented
KU0156 # 10 Y:1985 10 1985 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $239 $0 Not Implemented
KU0156 # 11 Y:1985 11 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $141 $40 Not Implemented
MA0022 # 01 Y:1985 01 1985 HEAT WATER WITH EXHAUST HEAT $2,163 $1,875 Not Implemented
MA0022 # 02 Y:1985 02 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $753 $1,827 Implemented
MA0022 # 03 Y:1985 03 1985 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $160 $154 Implemented
MA0022 # 04 Y:1985 04 1985 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $283 $0 Implemented
MA0022 # 05 Y:1985 05 1985 OPTIMIZE PLANT POWER FACTOR $432 $289 Implemented
MA0022 # 06 Y:1985 06 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,060 $1,190 Not Implemented
CO0016 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,955 $1,548 Implemented