IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,785

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0539 # 03 Y:2019 03 2019 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $4,651 $11,760 Not Implemented
UF0539 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,250 $11,853 Implemented
UF0539 # 05 Y:2019 05 2019 INSTALL OCCUPANCY SENSORS $1,002 $3,662 Implemented
UF0539 # 06 Y:2019 06 2019 INSTALL AN UNINTERUPTABLE POWER SUPPLY $44,758 $3,326 Not Implemented
MA0809 # 01 Y:2019 01 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $7,376 $23,715 Not Implemented
MA0809 # 02 Y:2019 02 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,745 $11,800 Not Implemented
MA0809 # 03 Y:2019 03 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $2,332 $150 Implemented
MA0809 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,772 $1,000 Implemented
MA0809 # 05 Y:2019 05 2019 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,114 $4,500 Implemented
MA0809 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,036 $3,057 Implemented
NL0039 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $36,367 $39,000 Implemented
NL0039 # 02 Y:2019 02 2019 REPAIR OR REPLACE STEAM TRAPS $15,324 $44 Implemented
NL0039 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,128 $2,497 Implemented
NL0039 # 04 Y:2019 04 2019 MINIMIZE WATER USAGE $10,832 $1,127 Implemented
NL0039 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,739 $1,600 Implemented
UK1911 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $45,696 $27,825 Implemented
UK1911 # 02 Y:2019 02 2019 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $487,425 $1,600,000 Not Implemented
UK1911 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,273 $24,987 Implemented
UK1911 # 04 Y:2019 04 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,363 $700 Implemented
UK1911 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,560 $3,950 Implemented
UK1911 # 06 Y:2019 06 2019 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $4,615 $7,400 Not Implemented
UK1911 # 07 Y:2019 07 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,750 $0 Not Implemented
UK1911 # 08 Y:2019 08 2019 INSULATE BARE EQUIPMENT $26,686 $9,826 Not Implemented
OR0725 # 01 Y:2019 01 2019 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $16,581 $12,780 Not Implemented
OR0725 # 02 Y:2019 02 2019 RECOVER AND REUSE WASTE MATERIAL $58,445 $110,790 Implemented