Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
92
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UW2417 # 03 Y:2024 | 03 | 2024 | UPGRADE OBSOLETE EQUIPMENT | $173,547 | $209,363 | n/a |
UW2417 # 02 Y:2024 | 02 | 2024 | INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION | $11,904 | $47,500 | n/a |
UW2417 # 01 Y:2024 | 01 | 2024 | MAKE A NEW BY-PRODUCT | $17,325 | $26,750 | n/a |
UW2415 # 06 Y:2024 | 06 | 2024 | MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS | $100,020 | $225,274 | n/a |
UW2415 # 12 Y:2024 | 12 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $62,298 | $19,622 | n/a |
UW2415 # 11 Y:2024 | 11 | 2024 | INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION | $64,033 | $47,500 | n/a |
UW2415 # 10 Y:2024 | 10 | 2024 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $32,733 | $55,000 | n/a |
UW2415 # 09 Y:2024 | 09 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $29,064 | $195,867 | n/a |
UW2415 # 08 Y:2024 | 08 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,441 | $20,000 | n/a |
UW2415 # 01 Y:2024 | 01 | 2024 | INSTALL OCCUPANCY SENSORS | $1,616 | $2,203 | n/a |
UW2415 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $60,318 | $7,015 | n/a |
UW2415 # 05 Y:2024 | 05 | 2024 | INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT | $1,080,000 | $870,000 | n/a |
UW2415 # 07 Y:2024 | 07 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,888 | $25,000 | n/a |
UW2415 # 02 Y:2024 | 02 | 2024 | ISOLATE HOT OR COLD EQUIPMENT | $7,755 | $3,047 | n/a |
UW2415 # 04 Y:2024 | 04 | 2024 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $1,150,001 | $380,750 | n/a |
OR0682 # 01 Y:2017 | 01 | 2017 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $104,297 | $70,000 | Not Implemented |
OR0682 # 02 Y:2017 | 02 | 2017 | REPLACE BOILER | $4,289 | $23,625 | Not Implemented |
OR0682 # 03 Y:2017 | 03 | 2017 | REPLACE BOILER | $1,937 | $9,815 | Not Implemented |
BS0045 # 05 Y:2014 | 05 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,833 | $5,036 | Not Implemented |
BS0045 # 06 Y:2014 | 06 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,790 | $13,052 | Not Implemented |
BS0045 # 04 Y:2014 | 04 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $986 | $1,373 | Not Implemented |
BS0045 # 03 Y:2014 | 03 | 2014 | PAY UTILITY BILLS ON TIME | $7,864 | $122 | Not Implemented |
BS0045 # 02 Y:2014 | 02 | 2014 | USE OPTIMUM THICKNESS INSULATION | $1,553 | $2,600 | Not Implemented |
BS0045 # 01 Y:2014 | 01 | 2014 | INSULATE BARE EQUIPMENT | $6,415 | $10,400 | Not Implemented |
BS0044 # 05 Y:2014 | 05 | 2014 | USE OPTIMUM THICKNESS INSULATION | $9,004 | $6,600 | Implemented |