Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
255
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0282 # 01 Y:2023 | 01 | 2023 | REPAIR OR REPLACE STEAM TRAPS | $3,672 | $165 | n/a |
UA0282 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $1,227 | $1,174 | n/a |
UA0282 # 06 Y:2023 | 06 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $95 | $250 | n/a |
UA0282 # 03 Y:2023 | 03 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $1,197 | $297 | n/a |
UA0282 # 02 Y:2023 | 02 | 2023 | REDUCE EXCESSIVE BOILER BLOWDOWN | $3,292 | $5,675 | n/a |
UA0282 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $927 | $1,176 | n/a |
UA0279 # 06 Y:2023 | 06 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $10,016 | $384 | Not Implemented |
UA0279 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $15,760 | $1,000 | Implemented |
UA0279 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,977 | $7,874 | Not Implemented |
UA0279 # 07 Y:2023 | 07 | 2023 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $161,801 | $1,711,707 | Not Implemented |
UA0279 # 08 Y:2023 | 08 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,175 | $54,709 | Not Implemented |
UA0279 # 04 Y:2023 | 04 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $3,760 | $1,407 | Implemented |
UA0279 # 01 Y:2023 | 01 | 2023 | INSTALL OCCUPANCY SENSORS | $1,228 | $2,262 | Implemented |
UA0279 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,676 | $8,591 | Implemented |
UA0277 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $31,464 | $8,591 | Not Implemented |
UA0277 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $3,286 | $3,921 | Not Implemented |
UA0277 # 03 Y:2023 | 03 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $14,476 | $81,775 | Not Implemented |
UA0277 # 04 Y:2023 | 04 | 2023 | OPTIMIZE PLANT POWER FACTOR | $3,523 | $4,208 | Not Implemented |
UA0277 # 06 Y:2023 | 06 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $712 | $800 | Implemented |
UA0277 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $27,216 | $2,500 | Not Implemented |
UA0274 # 06 Y:2023 | 06 | 2023 | INSTALL REPLACEMENT DOORS | $650 | $1,640 | Not Implemented |
UA0274 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,205 | $8,523 | Implemented |
UA0274 # 03 Y:2023 | 03 | 2023 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $15,300 | $72,265 | Not Implemented |
UA0274 # 07 Y:2023 | 07 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,122 | $501 | Not Implemented |
UA0274 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $11,102 | $1,000 | Implemented |