Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,674
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0631 # 02 Y:2025 | 02 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $16,164 | $441 | n/a |
SF0631 # 04 Y:2025 | 04 | 2025 | INSULATE BARE EQUIPMENT | $523 | $419 | n/a |
SF0631 # 06 Y:2025 | 06 | 2025 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $42,980 | $125,625 | n/a |
SF0631 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,844 | $0 | n/a |
SF0631 # 03 Y:2025 | 03 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $768 | $122 | n/a |
SF0631 # 07 Y:2025 | 07 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,255 | $13,190 | n/a |
SF0631 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,321 | $6,254 | n/a |
CI0038 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $57,768 | $242,254 | n/a |
CI0038 # 02 Y:2024 | 02 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $28,800 | $10,000 | n/a |
CI0038 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,400 | $1,000 | n/a |
CI0038 # 04 Y:2024 | 04 | 2024 | USE OPTIMUM THICKNESS INSULATION | $8,867 | $17,866 | n/a |
CI0038 # 05 Y:2024 | 05 | 2024 | USE PHOTOCELL CONTROLS | $4,714 | $1,500 | n/a |
CI0038 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $2,690 | $1,100 | n/a |
CI0038 # 09 Y:2024 | 09 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $577 | $150 | n/a |
CI0038 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,786 | $792 | n/a |
CI0038 # 08 Y:2024 | 08 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $765 | $3,000 | n/a |
SF0625 # 02 Y:2024 | 02 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $8,680 | $588 | n/a |
SF0625 # 09 Y:2024 | 09 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $14,307 | $15,295 | n/a |
SF0625 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,669 | $0 | n/a |
SF0625 # 11 Y:2024 | 11 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $177,385 | $2,104,448 | n/a |
SF0625 # 10 Y:2024 | 10 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,369 | $7,928 | n/a |
SF0625 # 07 Y:2024 | 07 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,943 | $10,277 | n/a |
SF0625 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,576 | $3,859 | n/a |
SF0625 # 04 Y:2024 | 04 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,071 | $854 | n/a |
SF0625 # 03 Y:2024 | 03 | 2024 | REPAIR AND ELIMINATE STEAM LEAKS | $8,671 | $516 | n/a |