Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
238
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0264 # 11 Y:2025 | 11 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $44,506 | $432,000 | n/a |
UU0264 # 01 Y:2025 | 01 | 2025 | INSTALL AUTOMATIC BOILER FUEL FEED SYSTEM | $79,422 | $143,652 | n/a |
UU0264 # 07 Y:2025 | 07 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,405 | $8,915 | n/a |
UU0264 # 05 Y:2025 | 05 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $3,332 | $4,000 | n/a |
UU0264 # 09 Y:2025 | 09 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $44,517 | $717,537 | n/a |
UU0264 # 08 Y:2025 | 08 | 2025 | INSTALL OCCUPANCY SENSORS | $538 | $1,531 | n/a |
UU0264 # 02 Y:2025 | 02 | 2025 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $215,672 | $730,950 | n/a |
UU0264 # 03 Y:2025 | 03 | 2025 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $729,671 | $3,645,455 | n/a |
UU0264 # 04 Y:2025 | 04 | 2025 | REPLACE BOILER | $379,077 | $4,080,441 | n/a |
UU0264 # 10 Y:2025 | 10 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $515 | $916 | n/a |
UU0264 # 06 Y:2025 | 06 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,905 | $7,317 | n/a |
OR0796 # 01 Y:2024 | 01 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $733 | $546 | n/a |
OR0796 # 02 Y:2024 | 02 | 2024 | ADOPT IN-HOUSE MATERIAL GENERATION | $86,946 | $168,430 | n/a |
OR0796 # 04 Y:2024 | 04 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $130,526 | $1,312,500 | n/a |
OR0796 # 03 Y:2024 | 03 | 2024 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $584 | $2,239 | n/a |
UU0235 # 02 Y:2024 | 02 | 2024 | USE STEAM SPARGING OR INJECTIONS IN PLACE OF INDIRECT HEATING | $271,861 | $3,050,000 | Not Implemented |
UU0235 # 03 Y:2024 | 03 | 2024 | INSULATE BARE EQUIPMENT | $12,478 | $23,282 | Not Implemented |
UU0235 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,664 | $1,013 | Implemented |
UU0235 # 04 Y:2024 | 04 | 2024 | USE OPTIMUM THICKNESS INSULATION | $6,968 | $8,826 | Not Implemented |
UU0236 # 02 Y:2024 | 02 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $72,320 | $46,000 | Implemented |
UU0236 # 04 Y:2024 | 04 | 2024 | INSULATE BARE EQUIPMENT | $5,640 | $3,090 | Implemented |
UU0236 # 01 Y:2024 | 01 | 2024 | REPLACE BOILER | $208,300 | $1,070,720 | Implemented |
UU0236 # 03 Y:2024 | 03 | 2024 | INSULATE BARE EQUIPMENT | $16,698 | $11,570 | Implemented |
UU0224 # 04 Y:2023 | 04 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,361 | $1,485 | Implemented |
UU0224 # 05 Y:2023 | 05 | 2023 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $2,224 | $4,500 | Not Implemented |