Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
37
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0918 # 11 Y:2015 | 11 | 2015 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $27,241 | $2,175 | Not Implemented |
OK0918 # 01 Y:2015 | 01 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $37,107 | $30,228 | Not Implemented |
OK0918 # 09 Y:2015 | 09 | 2015 | INSTALL SET-BACK TIMERS | $1,944 | $0 | Not Implemented |
OK0918 # 10 Y:2015 | 10 | 2015 | IMPROVE CLEANING EFFICIENCY BY MAINTAINING CLEANING SYSTEM | $1,481 | $0 | Implemented |
OK0918 # 02 Y:2015 | 02 | 2015 | INSTALL OCCUPANCY SENSORS | $9,764 | $29,490 | Not Implemented |
OK0918 # 06 Y:2015 | 06 | 2015 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $7,464 | $1,177 | Not Implemented |
OK0918 # 08 Y:2015 | 08 | 2015 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,167 | $2,205 | Not Implemented |
OK0918 # 03 Y:2015 | 03 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,801 | $8,234 | Not Implemented |
OK0918 # 04 Y:2015 | 04 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $10,151 | $4,000 | Not Implemented |
OK0918 # 05 Y:2015 | 05 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $80,375 | $97,500 | Not Implemented |
OK0918 # 07 Y:2015 | 07 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,374 | $0 | Implemented |
OK0909 # 12 Y:2015 | 12 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $43,900 | $87,882 | Not Implemented |
OK0909 # 13 Y:2015 | 13 | 2015 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $265,571 | $1,832,665 | Not Implemented |
OK0909 # 11 Y:2015 | 11 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $25,364 | $2,846 | Implemented |
OK0909 # 10 Y:2015 | 10 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,060 | $1,875 | Implemented |
OK0909 # 09 Y:2015 | 09 | 2015 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $1,404 | $824 | Implemented |
OK0909 # 08 Y:2015 | 08 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $34,856 | $41,000 | Implemented |
OK0909 # 07 Y:2015 | 07 | 2015 | INSTALL / REPAIR INSULATION ON STEAM LINES | $300 | $377 | Not Implemented |
OK0909 # 06 Y:2015 | 06 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $10,211 | $2,000 | Implemented |
OK0909 # 05 Y:2015 | 05 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,514 | $34,454 | Not Implemented |
OK0909 # 04 Y:2015 | 04 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $797 | $3,904 | Implemented |
OK0909 # 03 Y:2015 | 03 | 2015 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,249 | $8,691 | Not Implemented |
OK0909 # 02 Y:2015 | 02 | 2015 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,799 | $7,680 | Implemented |
OK0909 # 01 Y:2015 | 01 | 2015 | INSTALL TIMERS AND/OR THERMOSTATS | $3,077 | $0 | Implemented |
OK0907 # 06 Y:2015 | 06 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,388 | $503 | Not Implemented |