IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

442

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0301 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,177 $650 Not Implemented
OK0301 # 05 Y:1989 05 1989 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $4,774 $1,000 Not Implemented
OK0301 # 03 Y:1989 03 1989 OPTIMIZE PLANT POWER FACTOR $3,131 $6,000 Not Implemented
OK0301 # 04 Y:1989 04 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,277 $1,500 Implemented
OK0301 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,279 $823 Implemented
CO0170 # 01 Y:1989 01 1989 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $1,370 $3,200 Not Implemented
CO0170 # 05 Y:1989 05 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $900 $776 Implemented
CO0170 # 09 Y:1989 09 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $440 $650 Not Implemented
CO0170 # 06 Y:1989 06 1989 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,670 $6,111 Not Implemented
CO0170 # 07 Y:1989 07 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,460 $1,000 Implemented
CO0170 # 03 Y:1989 03 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,760 $1,000 Implemented
CO0170 # 04 Y:1989 04 1989 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,273 $3,850 Implemented
CO0170 # 10 Y:1989 10 1989 INSULATE BARE EQUIPMENT $200 $140 Not Implemented
MA0169 # 01 Y:1989 01 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,187 $1,752 Not Implemented
MA0169 # 02 Y:1989 02 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $582 $740 Implemented
CO0170 # 02 Y:1989 02 1989 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $660 $500 Not Implemented
CO0170 # 08 Y:1989 08 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $245 $750 Implemented
MA0169 # 05 Y:1989 05 1989 INSTALL TIMERS AND/OR THERMOSTATS $405 $0 Not Implemented
MA0169 # 03 Y:1989 03 1989 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,087 $0 Implemented
MA0169 # 04 Y:1989 04 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $231 $0 Implemented
GT0390 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $604 $2,400 Implemented
GT0390 # 06 Y:1989 06 1989 USE COLD WASTE WATER TO COOL CHILLER FEED WATER $14,480 $16,950 Not Implemented
AM0075 # 07 Y:1989 07 1989 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,085 $1,500 Implemented
WI0071 # 07 Y:1989 07 1989 INSTALL SET-BACK TIMERS $410 $200 Not Implemented
AM0075 # 06 Y:1989 06 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,895 $270 Implemented