IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

575

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0422 # 06 Y:1998 06 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $236 $776 Implemented
MA0422 # 03 Y:1998 03 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $764 $0 Implemented
MA0422 # 02 Y:1998 02 1998 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,889 $3,625 Not Implemented
MA0422 # 05 Y:1998 05 1998 RECOVER WASTE HEAT FROM EQUIPMENT $337 $346 Implemented
MA0422 # 01 Y:1998 01 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $20,664 $120,000 Not Implemented
MA0422 # 04 Y:1998 04 1998 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $452 $1,270 Implemented
MS0125 # 05 Y:1998 05 1998 MINIMIZE WATER USAGE $279 $10 Implemented
MS0125 # 06 Y:1998 06 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $5,878 $14,990 Not Implemented
MS0125 # 04 Y:1998 04 1998 ELIMINATE/REDUCE AN OPERATION $3,255 $0 Implemented
MS0125 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,761 $6,971 Implemented
MS0125 # 03 Y:1998 03 1998 INSTALL TIMERS AND/OR THERMOSTATS $125 $236 Implemented
MS0125 # 07 Y:1998 07 1998 PAY BILLS ON TIME TO AVOID LATE FEES $813 $324 Implemented
MS0125 # 02 Y:1998 02 1998 RECOVER WASTE HEAT FROM EQUIPMENT $2,888 $3,952 Not Implemented
AR0155 # 04 Y:1998 04 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $1,154 $304 Implemented
AR0155 # 06 Y:1998 06 1998 INSTALL AUTOMATIC PACKING EQUIPMENT $8,393 $10,000 Not Implemented
AR0155 # 02 Y:1998 02 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $24 $25 Implemented
AR0155 # 01 Y:1998 01 1998 REPLACE BOILER $2,248 $8,260 Implemented
AR0155 # 03 Y:1998 03 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $43 $0 Implemented
AR0155 # 05 Y:1998 05 1998 INSTALL AUTOMATIC PACKING EQUIPMENT $5,204 $5,200 Not Implemented
IA0212 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $279 $372 Implemented
IA0212 # 05 Y:1998 05 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $59,520 $111,000 Implemented
IA0212 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,330 $21,549 Implemented
IA0212 # 07 Y:1998 07 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,746 $75 Implemented
IA0212 # 04 Y:1998 04 1998 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $199,680 $35,485 Implemented
IA0212 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $37 $108 Implemented