IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,939

matching recommendations
Reset
SIC 201 Meat Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0169 # 04 Y:2008 04 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $7,803 $18,301 Not Implemented
MI0169 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,967 $40 Not Implemented
MI0169 # 06 Y:2008 06 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,528 $1,240 Not Implemented
UD0785 # 01 Y:2008 01 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $199,480 $23,400 Not Implemented
UD0785 # 02 Y:2008 02 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $66,859 $121,500 Implemented
UD0785 # 03 Y:2008 03 2008 REPLACE BOILER $54,105 $88,560 Not Implemented
UD0785 # 04 Y:2008 04 2008 COVER OPEN TANKS $13,767 $55,000 Not Implemented
UD0785 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,828 $98,908 Implemented
UD0785 # 06 Y:2008 06 2008 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $5,484 $640 Not Implemented
UD0785 # 07 Y:2008 07 2008 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,742 $5,924 Implemented
UD0785 # 08 Y:2008 08 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,606 $0 Not Implemented
UD0785 # 09 Y:2008 09 2008 OPTIMIZE PLANT POWER FACTOR $3,317 $4,500 Not Implemented
UD0785 # 10 Y:2008 10 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,512 $1,000 Implemented
UD0785 # 11 Y:2008 11 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,180 $0 Not Implemented
GT0851 # 01 Y:2008 01 2008 INCREASE AMOUNT OF CONDENSATE RETURNED $48,953 $8,350 Not Implemented
GT0851 # 02 Y:2008 02 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,800 $0 Not Implemented
GT0851 # 03 Y:2008 03 2008 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $15,410 $0 Not Implemented
GT0851 # 04 Y:2008 04 2008 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $18,784 $450 Not Implemented
GT0851 # 05 Y:2008 05 2008 REPAIR AND ELIMINATE STEAM LEAKS $13,289 $2,260 Not Implemented
GT0851 # 06 Y:2008 06 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $2,838 $1,832 Not Implemented
GT0851 # 07 Y:2008 07 2008 MINIMIZE WATER USAGE $20,751 $3,000 Not Implemented
GT0851 # 08 Y:2008 08 2008 SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM $10,080 $32,550 Not Implemented
GT0851 # 09 Y:2008 09 2008 RECOVER WASTE HEAT FROM EQUIPMENT $12,485 $24,000 Not Implemented
GT0851 # 10 Y:2008 10 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,770 $5,110 Not Implemented
MS0325 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,471 $24,719 Implemented