IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

148

matching recommendations
Reset
SIC 201 Meat Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0389 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,929 $6,000 Implemented
UD0389 # 04 Y:1992 04 1992 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $12,996 $25,000 Not Implemented
UD0371 # 01 Y:1992 01 1992 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,032 $300 Implemented
UD0371 # 02 Y:1992 02 1992 INSTALL SET-BACK TIMERS $473 $0 Implemented
UD0371 # 03 Y:1992 03 1992 HEAT WATER WITH EXHAUST HEAT $11,914 $47,000 Not Implemented
UD0371 # 04 Y:1992 04 1992 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,388 $45,000 Implemented
UD0250 # 01 Y:1988 01 1988 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $22,500 $50,000 Not Implemented
UD0250 # 02 Y:1988 02 1988 RECOVER WASTE HEAT FROM EQUIPMENT $3,618 $7,000 Not Implemented
UD0250 # 03 Y:1988 03 1988 INSULATE BARE EQUIPMENT $1,780 $840 Not Implemented
UD0250 # 04 Y:1988 04 1988 INSTALL SET-BACK TIMERS $1,725 $25 Not Implemented
UD0239 # 01 Y:1987 01 1987 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,627 $2,500 Implemented
UD0239 # 02 Y:1987 02 1987 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $23,356 $10,000 Implemented
UD0239 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,341 $600 Implemented
UD0239 # 04 Y:1987 04 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,069 $6,000 Implemented
UD0212 # 01 Y:1987 01 1987 RECOVER WASTE HEAT FROM EQUIPMENT $2,241 $1,000 Implemented
UD0212 # 03 Y:1987 03 1987 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $34,293 $90,000 Not Implemented
UD0212 # 04 Y:1987 04 1987 USE DEMAND CONTROLLER OR LOAD SHEDDER $5,670 $18,000 Not Implemented
UD0181 # 01 Y:1985 01 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,612 $200 Implemented
UD0181 # 02 Y:1985 02 1985 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,753 $700 Implemented
UD0181 # 03 Y:1985 03 1985 TURN OFF EQUIPMENT WHEN NOT IN USE $2,761 $0 Implemented
UD0181 # 04 Y:1985 04 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,836 $4,000 Not Implemented
UD0181 # 05 Y:1985 05 1985 TURN OFF EQUIPMENT WHEN NOT IN USE $1,445 $0 Implemented
UD0181 # 06 Y:1985 06 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $871 $1,600 Implemented