IAC Assessment: UD0239
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0239
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1987
Principal Product MEAT PROCESSING
NAICS n/a
SIC 2011 - Meat Packing Plants
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 2,100
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $197,907 3,766,120 kWh $0.05
Natural Gas $154,734 32,192 MMBtu $4.81
TOTAL ENERGY COSTS $352,641
RECOMMENDED SAVINGS* $32,393 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,393
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$2,627
Cost:
$2,500
$2,627 95,252 - - - - $2,627
95,252
kWh
-
-
MMBtu
-
-
$
02: 2.5121 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH Savings:
$23,356
Cost:
$10,000
- - $20,448 4,260 $2,908 - -
-
kWh
$20,448
4,260
MMBtu
$2,908
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,341
Cost:
$600
$693 14,947 - - $648 - $693
14,947
kWh
-
-
MMBtu
$648
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$5,069
Cost:
$6,000
- - $5,069 1,056 - - -
-
kWh
$5,069
1,056
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$32,393
Cost:
$19,100
$3,320 110,199 $25,517 5,316 $3,556 - $3,320
110,199
kWh
$25,517
5,316
MMBtu
$3,556
-
$
TOTAL IMPLEMENTED Savings:
$32,393
Cost:
$19,100
$3,320 110,199 $25,517 5,316 $3,556 - $3,320
110,199
kWh
$25,517
5,316
MMBtu
$3,556
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes