IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 201 Meat Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0476 # 05 Y:2017 05 2017 RECOVER WASTE HEAT FROM EQUIPMENT $17,157 $50,000 n/a
UM0476 # 04 Y:2017 04 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,512 $8,125 n/a
UM0476 # 03 Y:2017 03 2017 INSTALL OCCUPANCY SENSORS $1,056 $2,500 n/a
UM0476 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,110 $16,000 n/a
UM0476 # 01 Y:2017 01 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $10,342 $9,000 n/a
UM0283 # 05 Y:2005 05 2005 AIR CONDITION ONLY SPACE NECESSARY $793 $2,117 Not Implemented
UM0283 # 04 Y:2005 04 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $873 $3,000 Not Implemented
UM0283 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,024 $300 Implemented
UM0283 # 02 Y:2005 02 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,056 $2,500 Implemented
UM0283 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,568 $6,878 Implemented
UM0026 # 03 Y:1995 03 1995 INSTALL AUTOMATIC STACK DAMPER $855 $500 Not Implemented
UM0026 # 04 Y:1995 04 1995 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $443 $451 Not Implemented
UM0026 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,265 $5,362 Implemented
UM0026 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $215 $305 Implemented
UM0016 # 04 Y:1995 04 1995 INSTALL TIMERS AND/OR THERMOSTATS $2,530 $460 Implemented
UM0016 # 03 Y:1995 03 1995 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $8,760 $530 Implemented
UM0016 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,210 $15,700 Implemented
UM0016 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $536 $462 Implemented
ND0025 # 01 Y:1992 01 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,354 $1,000 Implemented
ND0025 # 06 Y:1992 06 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $140 $250 Implemented
ND0025 # 05 Y:1992 05 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $409 $300 Implemented
ND0025 # 04 Y:1992 04 1992 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,571 $0 Not Implemented
ND0025 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,424 $1,584 Not Implemented
ND0025 # 02 Y:1992 02 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,815 $8,000 Implemented