IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

159

matching recommendations
Reset
SIC 201 Meat Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1104 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $179 $580 n/a
OK1104 # 03 Y:2024 03 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $14,088 $189,810 n/a
OK1104 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,987 $1,552 n/a
OK1104 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $89 $0 n/a
OK0884 # 12 Y:2014 12 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $3,196 $349 Not Implemented
OK0884 # 07 Y:2014 07 2014 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $7,321 $5,500 Not Implemented
OK0884 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,165 $5,440 Implemented
OK0884 # 09 Y:2014 09 2014 INSULATE BARE EQUIPMENT $451 $189 Not Implemented
OK0884 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,334 $6,440 Not Implemented
OK0884 # 10 Y:2014 10 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,109 $30,860 Not Implemented
OK0884 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,514 $25,520 Not Implemented
OK0884 # 11 Y:2014 11 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,402 $32,400 Not Implemented
OK0884 # 08 Y:2014 08 2014 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,563 $280 Implemented
OK0884 # 14 Y:2014 14 2014 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $296,879 $1,365,235 Not Implemented
OK0884 # 13 Y:2014 13 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,973 $22,493 Not Implemented
OK0884 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $870 $4,275 Implemented
OK0884 # 01 Y:2014 01 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $688 $875 Not Implemented
OK0884 # 02 Y:2014 02 2014 RECOVER WASTE HEAT FROM EQUIPMENT $1,067 $847 Not Implemented
OK0811 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,716 $11,429 Not Implemented
OK0811 # 09 Y:2011 09 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $61,620 $459 Not Implemented
OK0811 # 02 Y:2011 02 2011 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $17,432 $60,934 Not Implemented
OK0811 # 03 Y:2011 03 2011 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $2,854 $2,600 Implemented
OK0811 # 10 Y:2011 10 2011 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $22,682 $0 Implemented
OK0811 # 08 Y:2011 08 2011 MINIMIZE WATER USAGE $159,930 $46,397 Not Implemented
OK0811 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $160 $944 Implemented