IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
SIC 201 Meat Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0433 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,706 $3,257 n/a
MI0433 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,622 $1,720 n/a
MI0433 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $1,297 $1,752 n/a
MI0433 # 05 Y:2023 05 2023 PAY UTILITY BILLS ON TIME $202 $0 n/a
MI0433 # 01 Y:2023 01 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,476 $80 n/a
MI0345 # 04 Y:2018 04 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,410 $1,982 Not Implemented
MI0345 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,576 $3,443 Implemented
MI0345 # 02 Y:2018 02 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $6,837 $3,204 Implemented
MI0345 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $7,969 $3,100 Implemented
MI0345 # 05 Y:2018 05 2018 INSTALL OCCUPANCY SENSORS $1,380 $540 Implemented
MI0345 # 06 Y:2018 06 2018 USE SOLAR HEAT TO HEAT WATER $1,166 $2,755 Implemented
MI0345 # 08 Y:2018 08 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $785 $1,560 Not Implemented
MI0345 # 07 Y:2018 07 2018 OPTIMIZE PLANT POWER FACTOR $810 $2,138 Not Implemented
MI0329 # 01 Y:2018 01 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $9,609 $40 Implemented
MI0329 # 02 Y:2018 02 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,815 $1,746 Not Implemented
MI0329 # 03 Y:2018 03 2018 INSTALL / REPAIR INSULATION ON STEAM LINES $7,784 $636 Not Implemented
MI0329 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,950 $1,660 Implemented
MI0329 # 05 Y:2018 05 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,453 $2,520 Implemented
MI0329 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,257 $10,017 Implemented
MI0329 # 07 Y:2018 07 2018 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $4,580 $460 Implemented
MI0329 # 08 Y:2018 08 2018 OPTIMIZE PLANT POWER FACTOR $3,469 $12,235 Not Implemented
MI0329 # 09 Y:2018 09 2018 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,990 $4,250 Not Implemented
MI0329 # 10 Y:2018 10 2018 INSTALL OCCUPANCY SENSORS $2,804 $1,060 Implemented
MI0329 # 11 Y:2018 11 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $535 $40 Implemented
MI0169 # 03 Y:2008 03 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $19,089 $3,928 Not Implemented