Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,407
matching recommendationsSIC | 2013 | Sausages And Other Prepared Meats |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1008 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,619 | $3,650 | Implemented |
UD1008 # 06 Y:2019 | 06 | 2019 | USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION | $8,111 | $13,455 | Not Implemented |
UD1008 # 07 Y:2019 | 07 | 2019 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $5,658 | $0 | Not Implemented |
UD1008 # 08 Y:2019 | 08 | 2019 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $3,596 | $0 | Not Implemented |
UD1008 # 09 Y:2019 | 09 | 2019 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $28,777 | $27,800 | Not Implemented |
UD1008 # 10 Y:2019 | 10 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,896 | $500 | Implemented |
UD1008 # 11 Y:2019 | 11 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,177 | $165,000 | Implemented |
UD1007 # 01 Y:2019 | 01 | 2019 | DEVELOP A REPAIR/REPLACE POLICY | $21,932 | $0 | Not Implemented |
UD1007 # 02 Y:2019 | 02 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $924 | $0 | Not Implemented |
UD1007 # 03 Y:2019 | 03 | 2019 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $87,749 | $5,000 | Not Implemented |
UD1007 # 04 Y:2019 | 04 | 2019 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $80,784 | $10,000 | Not Implemented |
UD1007 # 05 Y:2019 | 05 | 2019 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $4,980 | $0 | Implemented |
UD1007 # 06 Y:2019 | 06 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,566 | $4,400 | Not Implemented |
UD1007 # 07 Y:2019 | 07 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,535 | $500 | Not Implemented |
UD1007 # 08 Y:2019 | 08 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,204 | $0 | Implemented |
UD1007 # 09 Y:2019 | 09 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,737 | $1,000 | Not Implemented |
UD1007 # 10 Y:2019 | 10 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,710 | $34,800 | Not Implemented |
UD1007 # 11 Y:2019 | 11 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,235 | $23,550 | Implemented |
OK1020 # 07 Y:2019 | 07 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,410 | $1,270 | Not Implemented |
OK1020 # 06 Y:2019 | 06 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $19,990 | $0 | Not Implemented |
OK1020 # 05 Y:2019 | 05 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $33,536 | $500 | Not Implemented |
OK1020 # 04 Y:2019 | 04 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $84,978 | $73,560 | Not Implemented |
OK1020 # 03 Y:2019 | 03 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $111,877 | $100,000 | Not Implemented |
OK1020 # 02 Y:2019 | 02 | 2019 | OPTIMIZE PLANT POWER FACTOR | $91,270 | $50,570 | Not Implemented |
OK1020 # 01 Y:2019 | 01 | 2019 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $164,531 | $0 | Not Implemented |