IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,407

matching recommendations
Reset
SIC 2013 Sausages And Other Prepared Meats
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0248 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,174 $45,562 Implemented
MZ0248 # 02 Y:2018 02 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,015 $1,988 Implemented
MZ0248 # 03 Y:2018 03 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,291 $65,400 Implemented
MZ0248 # 04 Y:2018 04 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,536 $0 Not Implemented
NC0601 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,641 $200 Implemented
NC0601 # 02 Y:2017 02 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,840 $750 Not Implemented
NC0601 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,606 $100 Not Implemented
NC0601 # 04 Y:2017 04 2017 KEEP BOILER TUBES CLEAN $2,408 $1,000 Implemented
NC0601 # 05 Y:2017 05 2017 INSULATE FEEDWATER TANK $792 $750 Not Implemented
NC0601 # 06 Y:2017 06 2017 RECOVER WASTE HEAT FROM EQUIPMENT $15,825 $82,000 Not Implemented
NC0601 # 07 Y:2017 07 2017 ADOPT IN-HOUSE MATERIAL GENERATION $21,773 $20,000 Not Implemented
NC0601 # 08 Y:2017 08 2017 INSTALL OCCUPANCY SENSORS $217 $487 Not Implemented
NC0601 # 09 Y:2017 09 2017 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $2,876 $30 Not Implemented
NL0007 # 01 Y:2017 01 2017 RECOVER WASTE HEAT FROM EQUIPMENT $62,200 $77,400 Not Implemented
NL0007 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $47,300 $5,400 Implemented
NL0007 # 03 Y:2017 03 2017 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $36,200 $1,700 Implemented
NL0007 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,300 $67,600 Implemented
NL0007 # 05 Y:2017 05 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,000 $3,100 Not Implemented
NL0007 # 06 Y:2017 06 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,250 $12,000 Implemented
NL0007 # 07 Y:2017 07 2017 INSULATE BARE EQUIPMENT $2,700 $840 Implemented
UD0969 # 01 Y:2017 01 2017 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,613 $30 Implemented
UD0969 # 02 Y:2017 02 2017 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $4,357 $30 Implemented
UD0969 # 03 Y:2017 03 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,188 $30 Implemented
UD0969 # 04 Y:2017 04 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,470 $2,500 Not Implemented
UD0969 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,419 $1,000 Implemented