IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

104

matching recommendations
Reset
SIC 2013 Sausages And Other Prepared Meats
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0897 # 05 Y:2024 05 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $620 $0 n/a
AM0897 # 01 Y:2024 01 2024 OPTIMIZE PLANT POWER FACTOR $32,420 $45,905 n/a
AM0897 # 08 Y:2024 08 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $215 $100 n/a
AM0897 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,060 $4,860 n/a
AM0897 # 06 Y:2024 06 2024 INSTALL OCCUPANCY SENSORS $460 $98 n/a
AM0897 # 04 Y:2024 04 2024 USE PHOTOCELL CONTROLS $520 $102 n/a
AM0897 # 02 Y:2024 02 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,400 $32,265 n/a
AM0897 # 07 Y:2024 07 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $300 $22 n/a
AM0730 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $470 $500 Implemented
AM0730 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $760 $10 Not Implemented
AM0730 # 01 Y:2017 01 2017 UPGRADE CONTROLS ON COMPRESSORS $1,220 $20 Implemented
AM0730 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $890 $2,140 Implemented
TP0010 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $973 $874 n/a
TP0010 # 05 Y:2000 05 2000 COMBINE UTILITY METERS $660 $415 n/a
TP0010 # 02 Y:2000 02 2000 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $10,633 $2,612 n/a
TP0010 # 01 Y:2000 01 2000 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $9,563 $3,724 n/a
TP0010 # 07 Y:2000 07 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $173 $267 n/a
TP0010 # 03 Y:2000 03 2000 USE SYNTHETIC LUBRICANT $1,314 $0 n/a
TP0010 # 08 Y:2000 08 2000 ADD AREA LIGHTING SWITCHES $111 $0 n/a
TP0010 # 06 Y:2000 06 2000 INSTALL OCCUPANCY SENSORS $428 $450 n/a
TP0009 # 08 Y:1999 08 1999 ADD AREA LIGHTING SWITCHES $82 $0 Implemented
TP0009 # 06 Y:1999 06 1999 INSTALL OCCUPANCY SENSORS $123 $182 Implemented
TP0009 # 07 Y:1999 07 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $105 $292 Implemented
TP0009 # 03 Y:1999 03 1999 INSTALL SPECTRAL REFLECTORS / DELAMP $394 $160 Implemented
TP0009 # 05 Y:1999 05 1999 USE SYNTHETIC LUBRICANT $187 $0 Implemented