Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Prairie View, A&M |
---|---|
Assessment Year | 2000 |
Principal Product | Beef and Chicken products |
NAICS | n/a |
SIC | 2013 - Sausages And Other Prepared Meats |
Sales | $10,000,000-$50,000,000 |
# of Employees | 135 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 20,400,000 Pieces |
Production Hrs. Annual | 4,080 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $185,167 | 5,106,682 | kWh | $0.04 |
Electricity Demand | $12,189 | 4,052 | kW-months/year | $3.01 |
Natural Gas | $5,367 | 973 | MMBtu | $5.52 |
TOTAL ENERGY COSTS | $202,723 | |||
RECOMMENDED SAVINGS* | $23,855 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Electricity Fees | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $9,563 Cost: $3,724 |
- | - | - | - | - | - | $9,563 | 19,125 |
- - kWh |
- - kW-months/year |
- - $ |
$9,563 19,125 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $10,633 Cost: $2,612 |
- | - | - | - | - | - | $10,633 | 7,650 |
- - kWh |
- - kW-months/year |
- - $ |
$10,633 7,650 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $1,314 Cost: - |
$502 | 22,274 | $812 | 66 | - | - | - | - |
$502 22,274 kWh |
$812 66 kW-months/year |
- - $ |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $973 Cost: $874 |
$373 | 16,706 | $600 | 49 | - | - | - | - |
$373 16,706 kWh |
$600 49 kW-months/year |
- - $ |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.8112 COMBINE UTILITY METERS |
Savings: $660 Cost: $415 |
- | - | - | - | $660 | - | - | - |
- - kWh |
- - kW-months/year |
$660 - $ |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $428 Cost: $450 |
$428 | 19,050 | - | - | - | - | - | - |
$428 19,050 kWh |
- - kW-months/year |
- - $ |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $173 Cost: $267 |
$99 | 4,396 | $74 | 6 | - | - | - | - |
$99 4,396 kWh |
$74 6 kW-months/year |
- - $ |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7131 ADD AREA LIGHTING SWITCHES |
Savings: $111 Cost: - |
$111 | 4,982 | - | - | - | - | - | - |
$111 4,982 kWh |
- - kW-months/year |
- - $ |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $23,855 Cost: $8,342 |
$1,513 | 67,408 | $1,486 | 121 | $660 | - | $20,196 | 26,775 | $1,513 67,408 kWh |
$1,486 121 kW-months/year |
$660 - $ |
$20,196 26,775 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - $ |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Electricity Fees | Solid Waste (non-haz) |